background image

1

SAVE THESE INSTRUCTIONS!

- This product is ETL listed.
- This product is ceiling mount.
- The NCM-SP-_ and SP1 connectors physically connect 
  two NC_M-_ Nova Ceiling Modular Channels together and 
  conduct the power from a remote power supply powering 
  up to two channels.

IMPORTANT INFORMATION

1718 W. Fullerton Chicago, IL 60614
Ph: 773.770.1195 ● Fax: 773.935.5613
www.PureEdgeLighting.com ● [email protected]
© 2016 PureEdge Lighting. All Rights Reserved. 

Doc # 904-NCM-SP_01

Installation Instructions for 

Nova Ceiling Modular Straight Power

Connector

NCM-SP_-_

Section One: 4" Square Split Canopy

NOTE:

 

Omit this section if using 1" Rectangle Canopy. See 

Section Two.

1:

 Feed the low voltage wires from the power supply through 

    the crossbar center hole.

2:

 Mount the crossbar to the junction box holes using two

    #8-32 screws.

3:

 Complete installation by following steps in Section Three.

A

#8-32
SCREW

2

CROSSBAR

JUNCTION
BOX

NOTE:

 

Ensure remote power supply wires are present in the 

junction box. Refer to instructions provided with the power 
supply.

1

Section Two: 1" Rectangle Canopy

1:

 Mount each adjustable mounting bar to one side of the 

    junction box (mounts to any side of the housing depending 
    on the orientation of the channel) and secure them with the 
    mounting brackets and Phillips screws provided.

B

VERTICAL ORIENTATION

HORIZONTAL ORIENTATION

1

1

JUNCTION
BOX

ADJUSTABLE
MOUNTING BARS

MOUNTING
BRACKET

SCREW

JUNCTION
BOX

NOTE:

 

Omit this section if using 4" Square Split Canopy.

Reviews: