1
SAVE THESE INSTRUCTIONS!
- This product is ETL listed.
- This product is ceiling mount.
- The NCM-SP-_ and SP1 connectors physically connect
two NC_M-_ Nova Ceiling Modular Channels together and
conduct the power from a remote power supply powering
up to two channels.
IMPORTANT INFORMATION
1718 W. Fullerton Chicago, IL 60614
Ph: 773.770.1195 ● Fax: 773.935.5613
www.PureEdgeLighting.com ● [email protected]
© 2016 PureEdge Lighting. All Rights Reserved.
Doc # 904-NCM-SP_01
Installation Instructions for
Nova Ceiling Modular Straight Power
Connector
NCM-SP_-_
Section One: 4" Square Split Canopy
NOTE:
Omit this section if using 1" Rectangle Canopy. See
Section Two.
1:
Feed the low voltage wires from the power supply through
the crossbar center hole.
2:
Mount the crossbar to the junction box holes using two
#8-32 screws.
3:
Complete installation by following steps in Section Three.
A
#8-32
SCREW
2
CROSSBAR
JUNCTION
BOX
NOTE:
Ensure remote power supply wires are present in the
junction box. Refer to instructions provided with the power
supply.
1
Section Two: 1" Rectangle Canopy
1:
Mount each adjustable mounting bar to one side of the
junction box (mounts to any side of the housing depending
on the orientation of the channel) and secure them with the
mounting brackets and Phillips screws provided.
B
VERTICAL ORIENTATION
HORIZONTAL ORIENTATION
1
1
JUNCTION
BOX
ADJUSTABLE
MOUNTING BARS
MOUNTING
BRACKET
SCREW
JUNCTION
BOX
NOTE:
Omit this section if using 4" Square Split Canopy.