CONTROL CENTRE INSTALLATION TOOLS LIST
The following items are required:
1 x Control Centre
2 x Mounting Brackets
2 x Mounting Screws
2 x Wall plugs
Phillips Head Screwdriver
Drill and 7mm bit
CONTROL CENTRE INSTALLATION
The Control Centre should be installed at least 1m above ground in a well
ventilated area away form direct sunlight and rain exposure.
The Control Centre should be mounted no further that 2.5 metres away from the
electrolytic cell.
Ensure that the Control Centre is not installed in a closed unventilated shed. Do
not store chemicals or fertilizers near the Control Centre installation or corro-
sion may occur.
If mounting the Control Centre on a post install a flat panel as a waterproof
backing plate.
Mount the Control Centre with the Green Plugs and Mounting Brackets
supplied.