![pumpa BLUE LINE PSP Series Translation Of The Original Instruction Manual Download Page 23](http://html.mh-extra.com/html/pumpa/blue-line-psp-series/blue-line-psp-series_translation-of-the-original-instruction-manual_1625813023.webp)
EN
23
9.1 Electrical wiring diagram
10 Preparing the pump before starting
DISCONNECT THE PUMP FROM THE MAINS DURING ANY HANDLING AND PREVENT
IT FROM BEING ACCIDENTALLY CONNECTED.
10.1 Putting the pump into operation
After performing the tasks described in the preparation, put the pump into operation. Start the pump by
connecting the supply voltage. The pump starts pumping water into the delivery pipe.
10.2 Stopping pump operation
Disconnect the power cord from the power supply.
10.3 Storage
-
in a dry area with temperature above
5 °C
-
disconnect the pump from the power supply
-
drain out the remaining water from the pump
11 Maintenance
Check the cable frequently and replace it if you find that it is damaged, broken, etc. Maintain the
pump after 2,000 hours of operation according to the following three subsections.
11.1 Disassembly of the pump
Carefully check parts subject to wear such as bearings, mechanical seal, oil seal, o-ring, impeller,
etc. Replace damaged parts.