15
Setting up Your Conveyor
Publication ERSC-1020 Rev 1.1 – April 2020
FIGURE 8 – SINGLE ZONE ERSC ON RIGHT SIDE OF MODULE
M
ERGING
L
INES
The
Left Line
and
Right Line
are set up in a similar fashion. Each of these lines are in their own separate subnet that
is both different form each other and different from the
Main Line
. Regardless of whether these merging lines are
an Standard arrangement or a 90˚ arrangement; the conveyor zone that discharges product onto the
Merging Zone
must be the most downstream zone if its particular subnet. Figure 9 and Figure 10 illustrate this for an Standard
Left
Line
and a 90˚
Left Line
respectively. The same would apply if these were
Right Line
examples as well.
FIGURE 9 - STANDARD LEFT MERGE LINE DOWNSTREAM MODULE