background image

 

 

 

3. Maintenance. 
 

              All maintenance procedures can be performed after the disconnection of the power supply from the electrical 
grid. The power supply does not require any special maintenance procedures, but in the case of significant dust 
accumulation, dusting using compressed air is recommended.  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

   

 

 

Pulsar sp. j. 

Siedlec 150,  32-

744 Łapczyca, Polska 

Tel. (+48) 14-610-19-40, Fax. (+48) 14-610-19-50 

e-mail

[email protected]

[email protected]

 

http:// 

www.pulsar.pl

www.zasilacze.pl

 

 

WEEE MARKING

 

According to the EU WEE Directive 

– It is required not to dispose of electric or electronic waste as unsorted municipal waste and to collect such 

WEEE separately. 

 

Summary of Contents for PSB-48V5A

Page 1: ...tery charging 2 Output current of 4 A 1 A battery charging 3 Output current of 3 A 2 A battery charging Total device current battery 5 A max In case of power voltage decay prompt switching to battery supply occurs The power supply unit is protected against a short circuit an overload a surge or over voltage protection 1 2 Technical parameters Supply voltage 200 240 V 1 5 A 50 60 Hz Inrush current ...

Page 2: ...etween input network circuit and output circuits of power supply between input circuit and protection circuit between output circuit and protection circuit 2500 V AC min 1500 V AC min 500 V AC min Insulation resistance between input circuit and output or protection circuit 100 MΩ 500 V DC Storage temperature 20ºC 60ºC Vibrations and impulse waves during transport according to PN 83 T 42106 1 3 Des...

Page 3: ...in the disconnection state is not less than 3mm 1 Mount the PSU in a selected location and connect the wires 2 Connect the power cables 230 V to L N clips of the PSU The shock protection circuit shall be performed with a particular care i e the yellow and green wire coat of the power cable shall stick to one side of the terminal in the PSU enclosure Operation of the PSU without a properly made and...

Page 4: ...e of significant dust accumulation dusting using compressed air is recommended Pulsar sp j Siedlec 150 32 744 Łapczyca Polska Tel 48 14 610 19 40 Fax 48 14 610 19 50 e mail biuro pulsar pl sales pulsar pl http www pulsar pl www zasilacze pl WEEE MARKING According to the EU WEE Directive It is required not to dispose of electric or electronic waste as unsorted municipal waste and to collect such WE...

Reviews: