background image

www.pulsar.pl                                                      POE042455B   

GREEN POWER CCTV PoE

 

 

 

2.2. Installation procedure. 
 

1. Before installation, cut off the voltage in the 230V power-supply circuit. 

2. Mount the PSU in a selected location and lead the connecting cables.  
3.  Connect  the  power  cables  (230V  AC)  to  L-N  terminals  of  the  PSU.  Connect  the  ground  wire  to  the  terminal 

marked  with grounding  symbol:

.  Use  a  three-core  cable  (with a  yellow  and  green  PE  protection  wire)  to make 

the  connection.  The  power  cables  should  be  connected  to  the  appropriate  terminals  on  the  connection  board 
through the bushing.  

 

The shock protection circuit shall be done with a particular care: the yellow and green wire 

coat of  the  power  cable  should be connected to  the  terminal  marked  with  the  

  symbol  

in  the  PSU enclosure. Operation of the PSU without the properly made and fully operational 
shock  protection  circuit  is  UNACCEPTABLE!  It  can  cause  damage  to  the  equipment  or  an 
electric shock

 

 
4.  Connect  the  network  cables  (Ethernet)  to  the  PoE  module:  supply  voltage  is  present  only  at  the  AUX  sockets 
and the cameras should be connected to them. Pin assignment of the AUX and IN sockets is shown in the Figure 
4: 

 

 

Fig. 4 Pin assignment of the AUX and IN connectors. 

 
5. 

Use the F1/PTC1 ÷ F4/PTC4 jumpers to select the type of short circuit / overload protection of individual circuits. 

Jumper in the Fx position 

– melting fuse activation, PTCx – PTC fuse activation. 

6. If needed, the following technical connections can be made: 
- FPS technical output of the PSU status 

– indicates the voltage loss at any of the outputs (AUX1 ÷ AUX4). 

TAMPER

 indicating enclosure opening. 

7. Check the power supply output voltage: 
- output voltage of the unloaded power supply without a battery should amount to U=27,6V DC. 
8. Connect the batteries in series according to the color markings: 
- battery output (+V): BAT+ cable/ red 
- battery output (0V): BAT- cable / black 
9. Check the optical indication of the PSU status: green LED light on the PoE module. 
10. Close the cover after installing and checking the operation of the power supply.

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for GREEN POWER CCTV POE042455B

Page 1: ...POE042455B v 1 0 PoE 27 6V 4x1A 2x7Ah PoE power supply with battery backup EN Edition 5 from 16 03 2016 Supersedes the edition 4 from 25 05 2015 GREEN POWER CCTV PoE...

Page 2: ...upply output 4 2 Battery operation 4 3 Maintenance 1 Technical description 1 1 General description The PSU is designed for supply of up to 4 webcams requiring stabilized voltage of 24V DC 15 The PSU s...

Page 3: ...ains supply indication input 3 F1 F4 fuses in the AUX1 AUX4 F1A circuits 4 Jumper to select melting fuse or PTC polymer fuse 5 Green LED L1 L4 voltage indication at the AUX outputs during normal opera...

Page 4: ...operation of the switch mode PSU 3 V ADJ potentiometer regulation of the power supply output voltage 4 Selection jumper for charging current Ibat 0 5 A Ibat 2 A Description jumper on jumper off Factor...

Page 5: ...protection SCP and reverse polarity connection melting fuse Overvoltage protection OVP U 115 150 of the output voltage disconnection of the output voltage automatic return Deep discharge battery prot...

Page 6: ...class with normal relative humidity RH 90 maximum no condensation and temperature range from 10 C up to 40 C The power supply should operate in a vertical position in order to provide free and convec...

Page 7: ...r an electric shock 4 Connect the network cables Ethernet to the PoE module supply voltage is present only at the AUX sockets and the cameras should be connected to them Pin assignment of the AUX and...

Page 8: ...the LED is permanently illuminated No DC no DC voltage at the module input is indicated by turning off the LIN LED LFPS red LED Fig 2 component 10 is not illuminated during normal operation no failur...

Page 9: ...If the PTC polymer fuses are used disconnect the load from the power supply output for approximately 1 minute to restore output voltage the time needed to cool down the PTC fuse In case of melting fus...

Page 10: ...service centre of the manufacturer 6 The repair period mentioned in point 5 may be prolonged if there are no technical possibilities to carry out the repairs or if the equipment has been conditionally...

Reviews: