EN54-5A28
RED POWER
12
5.2. Installation procedure.
CAUTION!
Before installation, cut off the voltage in the 230 V power-supply circuit.
To switch power off, use an external switch, in which the distance between the contacts of
all poles in the disconnection state is not less than 3mm
It is required to install an installation switch with a nominal current of min. 3A in the power supply circuits
outside the power supply unit.
1. Mount the PSU in a selected location with use of special metal expansion bolts. Do not use PVC dowels.
2. Connect the power cables (~230 V) to the L-N terminals of the PSU. The cable length inside the housing
should not exceed 10 cm. Connect the ground wire to the terminal marked with grounding symbol. Use a
three-core cable (with a yellow and green protection wire) to make the connection.
The shock protection circuit shall be done with a particular care: the yellow and green wire coat of
the power cable should be connected to the terminal marked with the grounding symbol on the
PSU enclosure. Operation of the PSU without the properly made and fully operational shock protection
circuit is UNACCEPTABLE! It can cause damage to the equipment or an electric shock.
3.
Connect the receivers’ cables to the AUX1 and AUX2 output terminals on the PSU board.
4. If needed, connect the cables from the devices to the technical inputs and outputs:
- ALARM; technical output of collective failure of the PSU
- EPS FLT; technical output of AC power loss indication
- PSU FLT; technical output of PSU failure.
- APS FLT; technical output of the battery failure.
- EXTi; input of collective failure
5. Install the batteries in a designated area of the enclosure (see Fig. 4). Connect the batteries with the PSU
paying special attention to the correct polarity. Batteries must be connected in series using the special
cable (included). Attach the temperature sensor to any of the batteries with mounting tape (included).
6. Switch on the ~230 V supply. The corresponding LEDs on the power supply PCB should be ON: green AC
and green AUX1 and AUX2. Green LB LED should light up while charging.
7. Check the current consumption of the receivers, taking into account the battery charging current, so as not
to exceed the total current efficiency of the PSU (see section 4.1).
8. Once the tests are completed, close the enclosure.
Table 4. Operation parameters.
Environmental class PN-EN 12101-10:2007
2
Operating temperature
-5
ºC...+75 ºC
Storing temperature
-25
ºC...+60 ºC
Relative humidity
20 %...90 %, no condensation
Sinusoidal vibrations during operation:
10
÷ 50 Hz
50
÷ 150 Hz
0,1 G
0,5 G
Surges during operation
0,5 J
Direct insolation
unacceptable
Vibrations and surges during transport
According to the PN-83/T-42106 standard
Table 5. Factory settings of the PSU.
Delay time for EPS technical output
indicating AC power loss
10s
section 6.3.3
Acoustic indication
ON
section 6.3.4
LED display dimmer
OFF
section 6.3.5
EXTo output
OFF
section 6.3.2
Communication address
1
section 6.3.6
Transmission
115.2k 8E1
section 6.3.7 and 6.3.8