![Pts PTS90123 Series Installation Manual Download Page 7](http://html1.mh-extra.com/html/pts/pts90123-series/pts90123-series_installation-manual_1623487007.webp)
PTS 90
123
Series Small Cell
AC Power Distribution Load Centers
Installation Guide
7
All Rights Reserved, 201
8
888-820-3508
1.3 Wiring Diagrams
PTS90
123
Wiring Diagram
Caution: Installation shall be completed per all NEC and Local Codes. Do not install
PTS90
123
Systems before reading and understanding all specifications and
installation guides provided. Installation should be performed by a qualified installer.
www.pactechsol.com
www.pactechsol.com
/ATTVendor
Drawing
above
show
s
equipped with
Neutral to Ground
Bond Required when
U
sing for Service Equipment
.
S
uitable for Use as S
ervice Equipment
NEUTRAL to GROUND
BOND Require when using for
SERVICE EQUIPMENT
Drawing
above
show
s
equipped with
Single
SPD,
supporting up to
6
load breaker positions
.