5.3 Wiring Service and Load Connections
Caution: Installation shall be completed per all NEC and Local Codes. Do not install
PTS90
123
Systems before reading and understanding all specifications and
installation guides provided. Installation should be performed by a qualified installer.
5.3.
1
Wiring to be done in accordance with NEC and Local Jurisdictions Cod
e.
5.3
.2
Wire the Service
G
round to the internal ground bar
5.3
.3
Wire the Service
Neutral
to Neutral
bar
connection according to use and Local
Jurisdictional Code.
5.
3
.4 If wiring for Service Entrance, ensure that the provided
bond
strap is connected
between the internal ground bar and neutral bar
, and label accordingly.
5.
3
.
5
Wire the Service Feed to the
right side
(service side)
of the Main Breaker (s)
5.
3
.
6
Land Equipment ground to ground bar
5.
3
.
7
Land Equipment Neutral to Neutral bar
5.
3
.
8
Land Load feeds to
the right side (load side)
of load breaker(s)
5.
3
.
9
Ensure connections are properly seated in set screw capture ring openings prior to
tightening per specifications.
5.
3
.
10
Tighter per breaker and bar specifications