Generator Full Load DR02-
Adjust to generators
maximum amperage output in whole amps.
DelayShed DR01
- Delay period in seconds from the
generator start up until the 1st load will be restored.
Relay #1 Current DR03-
Adjust to the estimated
maximum amperage draw in whole amps for load # 1
Relay #2 Current DR04
- Adjust to the estimated
maximum amperage draw in whole amps for load #2
Actual Real-Time Amps
- Generator amp load as
measured by the controllers highest reading on CT 1-3
Relay #3 Current DR05-
Adjust to the estimated
maximum amperage draw in whole amps for load # 3
Relay #4 Current DR06
- Adjust to the estimated
maximum amperage draw in whole amps for load # 4
Real Time State of relays 1-4 (Fixed reading, not
adjustable)
Stabilize Time:
Adjust the time delay time in seconds
between the individual turn on of Relays 2-8
Generator Inrush Delay DR08-
Adjust allowable In
Rush delay time before load shedding will occur
DelayShed DR09
- Adjustment to compensate for CT
Voltage variations and generator-CT match. Adjust for
accurate
GEN Actual cur
reading
Real Time State of I2 Input (Fixed reading, not
adjustable)
Programmable Field Descriptions
Technical Support Call 800-648-68021