Generator Full Load DR02-

Adjust to generators

maximum amperage output in whole amps.

DelayShed DR01

- Delay period in seconds from the

generator start up until the 1st load will be restored.

Relay #1 Current DR03-

Adjust to the estimated

maximum amperage draw in whole amps for load # 1

Relay #2 Current DR04

- Adjust to the estimated

maximum amperage draw in whole amps for load #2

Actual  Real-Time Amps

- Generator amp load  as

measured by the controllers  highest reading on  CT 1-3

Relay #3 Current DR05-

Adjust to the estimated

maximum amperage draw in whole amps for load # 3

 Relay #4 Current DR06

- Adjust to the estimated

maximum amperage draw in whole amps for load # 4

Real Time State of relays 1-4  (Fixed reading, not
adjustable)

Stabilize Time:

Adjust the time delay time in seconds

between the individual turn on of Relays 2-8

Generator Inrush Delay DR08-

Adjust allowable In

Rush delay time before load shedding will occur

DelayShed DR09

- Adjustment to compensate for CT

Voltage variations and generator-CT match. Adjust for
accurate

GEN Actual cur

reading

Real Time State of I2 Input (Fixed reading, not
adjustable)

Programmable Field Descriptions