6.2. Maintenance by User 

a)

 

The boiler should be cleaned as necessary, without removing the cover panels. Before cleaning, put the main switch off 
and unplug the power cord. If the boiler surfaces are wet after the cleaning, the boiler should not be started until it dries. 

b)

 

The HCW pressure should be checked once a week, with replenishment of water as necessary – before replenishing, the 
boiler temperature (the reading shown on the boiler thermometer) must cool down to below 40°C. Failing to met this 
requirement may lead to leaks or ruptures in the boiler body (caused by thermal shrinkage). 

c)

 

Checking tightness of the flue-gas duct. 

d)

 

If there is a gas leak, shut the gas supply valve and call a specialised service centre. 

e)

 

Checking and cleaning the filter and sludge separator: 

1.

 

Immediately after the First Heating; 

2.

 

After the first week of operation; 

3.

 

Regularly once per month; or once per quarter if the sedimentation rate is lower. 

7. Safety of Life and Property 

7.1. Technical Requirements for Boilers – Product Compliance and Safety of Use  

Product compliance of the boilers is governed by the following Czech standards: 

Č

SN EN 297, 

Č

SN EN 437, 

Č

SN EN 50 165, 

Č

SN EN 60 335-1:1997. 

In addition to these, the present Instructions and the manufacturer's documentation must be complied with. Children and persons 
under the influence of drugs or otherwise incapable must be prevented from operating the boiler. 

7.2. Quality Compliance 

The boiler's quality compliance is provided by and checked within the manufacturer's Quality Assurance System – by Certificate 
BSQI No. 43319 of December 14,1997, the Quality Assurance System complies with the BS EN ISO 9001:1994 Quality 
Standard. 

Consistent levels of service quality for installations, maintenance and repairs are assured by the manufacturer's network of 
contractual service centres with necessary qualifications (cf. Item 3.1). 

The use of the boiler must follow the present Instructions and the manufacturer's other documentation included the boiler's 
delivery. If you have any doubts, feel any data to be incomplete, any advice unclear, or think that there has been an inadequate 
servicing of the boiler, contact one of the contractual service centres. 

8. Warranty 

The warranty on 

PROTHERM KLO

 boilers is provided as specified in the Guarantee Certificate, Service Booklet and under 

conditions specified in these Instructions.  

9. Complete Delivery 

9.1. Boiler Delivery 

PROTHERM KLO

 boilers are delivered completed and functionally tested. 

The delivery includes documentation, consisting of: 

–  Instructions for Use 

–  Certificate of Quality and Completeness 

–  Warranty Certificate 

–  Service Booklet 

–  List of authorised service centres  

9.2. Optional Accessories 

On special request, a room regulator, a DHW accumulator heater reservoir, and a three-way distribution valve can be supplied by 
the boiler manufacturer. 

 

13

Summary of Contents for 20 KLO

Page 1: ...By www heating spares co Tel 0161 620 6677 Instructions for Use and Installation of Cast Iron Boilers PROTHERM 20 30 40 50 60 KLO BEAR Version Protherm s r o ltd Pplk Plju ta 45 909 01 Skalica Slovak...

Page 2: ...ig 3b Vertical Control Panel 11 Fig 4a Electric Wiring Diagram of PROTHERM 60 KLO 18 Fig 4b Electric Wiring Diagram of PROTHERM 20 30 40 50 KLO 18 Fig 5a Regulation elements of SIT 843 combined gas ar...

Page 3: ...Do not remove or damage any labels or markings on the boiler 9 The boiler complies with all Czech applicable regulations If it is to be used in another country deviations in the regulations have to b...

Page 4: ...ted if the valve s motor is not active gets no voltage The boiler s manufacturer supplies both DHW reservoirs 100 150 200 l and suitable three way distribution valves l DHW heating takes preference ov...

Page 5: ...onnection Dimensions 1 Control panel 2 HCW pressure measuring point 3 HCW temperature measuring point 4 Boiler cast iron body 5 Combined gas armature 6 Water filling and discharging 7 Burner plate dis...

Page 6: ...the required and actual parameters i e the state of the boiler and the heating circuit the gas pipe leading out of the armature is part of the burner plate with 2 to 6 nozzles one per each burner tube...

Page 7: ...3 Chimney flange 4 Flue gas duct with draft dampener 5 SKKT chimney draft control system 6 Outgoing HCW 7 Gas supply 8 Cast iron elements 9 Incoming HCW 10 Combustion chamber 11 Secondary air supply 1...

Page 8: ...ce is solved by ventilation openings of sufficient size Gas appliances with flue gas removal to chimneys must not be in rooms in which negative air pressure is created by ventilation fans 3 4 Flue Gas...

Page 9: ...pes so that the pipe fixtures on the boiler should not be affected by any pressures or tensions The fixtures on the boiler have outside male threads l Closing valves are recommended to be installed on...

Page 10: ...gas piping i e electricity supply to the boiler must be stopped in addition to using the boiler switch e g by unplugging b Stopping the boiler whenever flammable or explosive vapours appear even if t...

Page 11: ...such defects may be caused by not igniting the flame no gas or the chimney draft control system if there is none or too low a draft or emergency thermostat if the HCW temperature is above 100 C may h...

Page 12: ...lements flue gas and emergency temperature thermostats disabled or replaced with elements different from those specified by the manufacturer Users are not allowed to tamper with the safety elements He...

Page 13: ...regulator If the boiler does not ignite and the defect indicator is off the operation is stopped due to one of the operational reasons we have just described the heating will automatically start agai...

Page 14: ...and persons under the influence of drugs or otherwise incapable must be prevented from operating the boiler 7 2 Quality Compliance The boiler s quality compliance is provided by and checked within the...

Page 15: ...olted on a palette Do not let any forces act on the casing when handling or when storing the boiler For handling without a palette the base can be used cf Chapter 2 For storage normal conditions have...

Page 16: ...eedle on the boiler pressure gauge 3 9 Electrical Connections of Boiler The electrical installation cabinet and the service part of the control panel are accessible when the top panel of the boiler is...

Page 17: ...nufacturer These elements must also be checked after each servicing on them 5 Boiler Operation 5 1 Boiler Preparation and Start Check water pressure on the boiler pressure gauge Turn the gas supply va...

Page 18: ...rocedure must be followed Only authorised service centres are allowed to carry out the conversion The following steps are to be followed 1 Dismount the burner from the boiler 2 Replace the nozzles wit...

Page 19: ...ig 4b Electric Wiring Diagram of PROTHERM 20 30 40 50 KLO HV Main switch PO1 Electrical fuse SP Power stage switch TL1 RESET button DT1 Emergency state indicator HT Emergency temperature thermostat TS...

Page 20: ...1 620 6677 Fig 5a Regulation elements of SIT 843 combined gas armature for boilers 20 30 40 50 KLO a Input b Output 1 Setting screw for maximum 2 Setting screw for minimum Fig 5b Regulation elements o...

Page 21: ...2 3 Flue gas removal manner to chimney to chimney diam outlet mm 130 130 Min required draft in chimney Pa 2 Flue gas temperature natural gas C 100 LPG C 95 Weight flowrate flue gas g s 13 3 19 8 Effi...

Page 22: ...ue gas removal manner to chimney to chimney to chimney diam outlet mm 150 180 180 Min required draft in chimney Pa 2 Flue gas temperature natural gas C 100 LPG C 95 Weight flowrate flue gas g s 26 6 3...

Reviews: