                                                                                                                                                                                                                                                                    Meko manuale  1_2011

C

 3.    INSTALLATION

3.1 

Preliminary Checks

Before the installation, to ensure correct working of the automation, please check the followings:

• 

Make sure the gate’s structure is suitable to be automated

• 

Check the weight, dimensions and type of the gate is appropriate to this type of automation.

• 

E

nsure the  gate is able to open and close smoothly and is free of obstacles that may cause the gate to potentially derail.

• 

Check the ground and all surfaces for the installation are suitable for stable and safe fixing of the gate automation.

• 

Make sure the installation area for the automation is wide enough to accommodate the anchor plate and the 

motor can be accessed easily in the event of power cuts. 

• 

Ensure the location where the automation is installed is not exposed to flood hazards; if in doubt raise the automation 

from above ground level.

• 

In cases where the automation has to be installed in a vehicles path or manoeuvre area, it is recommended to 

protect it against accidental damage.

• 

Ensure an efficient earth connection system is in place.

• 

Make sure the surfaces for photocells fixing areas are flat and smooth enough to allow a perfect alignment 

between transmitting and receiving units. They must both directly see each other as they are not reflective.

3.2 

 Electrical Set-up

3.2.1  STANDARD INSTALLATION

3.2.2  ELECTRICAL CABLES SPECIFICATIONS

The cables required the electrical set-up (not included in the pack) may vary according to quantity and 

type of devices installed.  

A

  Security cost 

2x0,75   

2x0,75

B

   Power supply 

2x1,50+T  

2x1,50+T

C

  Photocells 

rx 4x0,75 

rx 4x0,75

  Photocells 

tx 2x0,75 

tx 2x0,75

D

  Key contactor 

2x0,75   

2x0,75

E

  Warning light 

2x0,75   

2x0,75

230V

24V

Summary of Contents for MEKO

Page 1: ...MEKO Installation Manual OPENER FOR RACK DRIVEN SLIDING GATE ...

Page 2: ...es used in conjunction with the automation that has not been produced exclusively by Proteco CE COMPLIANCE DECLARATION Manufacturer PROTECO S r l Address Via Neive 77 12050 Castagnito CN ITALIA declares that IThe product type MEKO Electromechanical gear motor for sliding gate Models MEKO 4 MEKO 5 MEKO 8 Is built to be integrated into a machine or to be assembled with other machinery to crate a mac...

Page 3: ... anchor plate fixing 7 MDAM10Z Nut Ø10 for motor anchor plate fixing 8 MPC06 Cable grommet SH70 9 MTP22 Slot cover 10 MGR0610Z Limit bracket fixing screw 6x10 for B102 metal rack only 11 MVI0510BZ Screw TC 5x10 for cable block 12 MBC01 Black cable block 13 MVI4895DZ Self tapping screw 4 8x9 5 for lug 14 MFAG01 Yellow lug for earth system 15 MMA02 Limit switch tip 16 Release Key sacchetto accessori...

Page 4: ... the automation is installed is not exposed to flood hazards if in doubt raise the automation from above ground level In cases where the automation has to be installed in a vehicles path or manoeuvre area it is recommended to protect it against accidental damage Ensure an efficient earth connection system is in place Make sure the surfaces for photocells fixing areas are flat and smooth enough to ...

Page 5: ...nd fix the plate to the concrete using suitable plugs e Cut the cable ducts about 3cm above the anchor plate level and route the cables for accessories and electrical mains wiring as shown in Fig 2 diagram Ensure the cables are at least 30 50cm out from the ducting to allow easy wiring to the control panel 3 4 Installation of the gear motor a Lift up the motor cover and insert the four grub screws...

Page 6: ...l rack M4 12x30mm 1m sections a Move the gate manually to its open position b Assemble the three threaded stand offs on the first section of rack positioning in the middle of the slot Fig 10 c Align the first section of the rack to the gates edge and lower it on the pinion Use a spirit level to ensure the rack is perfectly straight and level d Weld the threaded stand off to the gate Fig 11 e Move ...

Page 7: ...al stop c Place the two screw fixings loosely on the closing limit bracket d Place the closing bracket on the rack and slide it until the limit switch is activated Fig 14 e Screw the two screws tightly to anchor the bracket onto the rack f Manually open the gate gate end aligned with the edge of the pillar g Place the two screws fixings loosely on the opening limit bracket h lace the opening brack...

Page 8: ...ate the cable of the main supply with the provided cable block Fig 18 Follow the control panel s instruction manual to proceed with the correct cable wiring Wire all cables for the earth system to the provided lug and fix onto the motor base point marked with symbol 5 START UP Power the system and proceed with a careful checking of the gear motor working and of all the accessories and safety devic...

Page 9: ...lations in force in your locality for safe disposal 6 RELEASE PROCEDURE FOR MANUAL OPERATION Fig 20 Always cut the main power of the system during the release and re locking procedure to avoid any accidental activation of the gate 6 1 How to unlock the motor for manual operating a Turn the red cap insert the key and turn it anti clockwise Fig 20 b Pull the handle until it is completely open 90 ang...

Page 10: ...Proteco S r l Via Neive 77 12050 CASTAGNITO CN ITALY Tel 39 0173 210111 Fax 39 0173 210199 info proteco net www proteco net ...

Reviews: