Lenntech
[email protected]
Tel. +31-152-610-900
www.lenntech.com
Fax. +31-152-616-289
Page 1: ...st revision by consulting the factory Specifications are subject to change without notice PRECAUTIONS Follow all instructions Failure to take every precaution listed will void the vessel warranty and...
Page 2: ...in the bearing plate to pull the head out It is recommended that you contact the factory for head removal tools or instructions SIDE PORT SEAL REPLACEMENT While it is possible to replace the side port...
Page 3: ...ith each vessel Allow one concentrate manifold to float In some systems the manifold can be connected to the vessels and supported by the floor but allowed to float in the axial direction to provide r...
Page 4: ...Lenntech info lenntech com Tel 31 152 610 900 www lenntech com Fax 31 152 616 289...
Page 5: ...rmation at the bottom of the ordering page for each vessel configuration 6 Sign and date the ordering page before you send it in NOTE Two ports per end maximum diametrically opposed Ports 1 and 5 are...
Page 6: ...0 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 310 320 330 340 350 360 370 Flow Rate gpm Velocity ft s 3 pipe 2 5 pipe Calculated Pressure D...
Page 7: ...Option NPT female threads Option Probing Port Option Probing Port Option Auto Shim feed end only FEED CONCENTRATE PORT CONFIGURATIONS Standard 3 IPS pipe grooved ends with ports in line 1K5K position...