background image

PROTEC

AC-200-dual USER MANUAL

AC-200-dual

USER MANUAL

Summary of Contents for AC-200-dual

Page 1: ...PROTEC AC 200 dual USER MANUAL AC 200 dual USER MANUAL...

Page 2: ...still highly recommended to leave maintenance job to specialized technicians self troubleshooting and convenient USB upgrade etc General safety The storage cylinder in this unit contains liquid refrig...

Page 3: ...TABLE 3 PART DESCRIPTION 4 OPERATION PREPARATIONS 5 EQUIPMENT CONNECTION Recovery vacuum oil injection charge Tank fill auto mode 7 RECOVERY 8 VACUUM 8 OIL INJECTION 9 CHARGE 9 TANK FILL 9 AUTO MODE 1...

Page 4: ...of dual gas cylinders one for R 134a one for HFO 1234yf 10KG New oil bottle capacity 250ml Used oil bottle capacity 400ml Dual condensers and cooling fans one for R 134a one for HFO 1234yf Max Pressu...

Page 5: ...A C system Tank fill Transfer liquid refrigerant from an external refrigerant storage cylinder to equipment cylinder Auto mode Performs the selected functions in a fully automatic sequence The machine...

Page 6: ...ad LP gauge R134a HFO1234yf Coupler connect fittings LCD screen HP gauge Fuse Power switch Vacuum pump New oil vessel Used oil vessel R134a refrigerant tank HFO1234yf Refrigerant tank R134a tank gauge...

Page 7: ...2 When you need transport the machine please screw those bolts on Fill equipment with refrigerant New equipment is empty you need to fill the equipment with refrigerant and refrigeration oil Through t...

Page 8: ...select refrigerant type If the refrigerant type selected is different from the refrigerant handled at previous operation the machine automatically recovers refrigerant inside machine pipelines and ma...

Page 9: ...ment Connection For recovery vacuum oil injection charge Auto Mode Warning Except the situations clearly stated in the manual during all equipment operations please maintain the vehicle engine and A C...

Page 10: ...internal refrigerant cylinder The machine should be left connected on the vehicle for a minimum time of 3 minutes longer in cold climates for any pressure increase test If after 3 minutes or longer if...

Page 11: ...s ENTER to start the process You can manually set charge amount with volume or select Charge by database to set charge amount by car make and model You can choose to charge through high side low side...

Page 12: ...to do calibration of load cells The load cell calibration is very simple and fast with just one step 1kg weight calibration step Warning Misoperation in calibration could bring about serious conseque...

Page 13: ...message Click OpenFile to select update to update e g file AC200 DUAL_V2 01 for main program update or Database_V2 02 for database update Then click Connect the PC displays the following message Clic...

Page 14: ...re next maintenance is displayed in the left beneath part of each operation interface Upon 480 operations having been made the machine displays the following message and users can continue using the e...

Page 15: ...to service manual 2 Change compressor 3 Fasten pressure sensor connection to PCA or change the pressure sensor No change in recovery volume 1 No refrigerant in A C 2 Support screw of gas cylinder loa...

Page 16: ...ve base is not well sealed Remove solenoid 8 from valve base clean the solenoid valve and valve base During vacuum there is suction in old oil bottle The contact between solenoid valve 2 and valve bas...

Reviews: