
12
Rev. A / November 2005
PRF-914B High Resistance Miniature Concentric Ring Fixture Set
3. After cleaning, perform Continuity, High Resistance and Verifier checks.
A. PRV-913B Dual Verification Fixture
1. Store the PRV-913B in a clean, dry environment.
2. Periodically, clean and dry the gold fixture contact segments twice with a solution of laboratory
grade isopropyl alcohol and laboratory quality swab.
Figure 13: View of PRF-912B Spring-Loaded
Test Pins, Socket & Teflon Mounting Disk
Figure 14: Insert Test Probe into its Socket
and Press Firmly to fully seat
Summary of Contents for PRF-914B
Page 1: ...User Manual PRF 914B MINIATURE CONCENTRIC RING FIXTURE ...
Page 2: ......
Page 15: ...15 Rev A November 2005 PRF 914B High Resistance Miniature Concentric Ring Fixture Set NOTES ...
Page 16: ...16 Rev A November 2005 PRF 914B High Resistance Miniature Concentric Ring Fixture Set NOTES ...
Page 17: ...17 Rev A November 2005 PRF 914B High Resistance Miniature Concentric Ring Fixture Set NOTES ...
Page 18: ...18 Rev A November 2005 PRF 914B High Resistance Miniature Concentric Ring Fixture Set NOTES ...
Page 19: ......