Whispbar Track System
EN
Q20
●
Use drill bit supplied, to drill holes in
marked positions.
●
Remove masking tape and apply non-
acetic silicon sealant around drilled holes.
●
Sit tracks on roof and line up tracks with
drilled holes.
●
Insert all cap screws through the drilled
holes.
●
With assistance, fit washer and nut loosely
onto each of the cap screws from inside the
canopy.
●
Use a spanner to tighten the nuts onto the
cap screws to 3Nm (2.2 ft lb) using the
provided 3mm provided hex key.
5