1.
Attach top supports and rails to columns. Ensure the mounting holes in the column remain aligned with the corresponding holes in the
beam or independent beam.
Align the beam or independent beam to the top support. Assemble using the M8x1.25 x 12mm length screws (4 per column) and a T40 Torx
driver. Be aware that the mounting holes may not be tapped. As they are inserted, the provided M8x1.25 x 12mm length screws will form
their own fastening threads if none are already present. An average fastening torque of 8Nm (6 lbs-ft) will be required to initially engage
the screw in the hole. The maximum tightening torque for these screws is 20Nm (15 lbs-ft). Repeat as necessary for remaining columns.
2.
Attach ganging tube to columns. Assemble using the M8-1.25 Tooth Lock Washer Nut (2 per column). The maximum tightening torque for
these nuts is 15.8Nm (10 ft-lbs). Repeat steps 1 and 2 for second set of columns, top supports and ganging tube.
A S S E M B L Y I N S T R U C T I O N S
proproffice.com 3
P E R C H A D J U S TA B L E H E I G H T B E N C H S Y S T E M