- 16 -
STARTING-UP
START-UP PROCEDURES
1) Check oil level in gearbox and in speed reducer if
so equipped. Use SAE 80W90 gear box oil.
2) Lubricate all points with a good quality
multipurpose grease.
3) Check chain take-up adjustment. The spring
maintaining the tension must be compressed to a
length between 3" and 3 1/4".
4) Verify for adequate tightness of all fastening
devices. Refer to torque chart on page 57.
5) Adjust skid shoes according to ground conditions
(Fig. 36).
6) Following the installation of the Snowblower on
the tractor,
do not forget
to lift the storage sup-
port (Fig. 37).
7) Make sure of a 540 RPM input to your
snowblower.
8) Check impeller adjustment. The tip of the blades
should be approximately 1/8" to 3/16" from the
discharge wall of the drum. If necessary, adjust
with the take-up screws provided (Fig. 38).
Figure 36
Figure 37
Figure 38
5
Summary of Contents for P-1020
Page 2: ...Copyright Les Machineries Pronovost Inc 2010 All rights reserved Printed in Canada...
Page 4: ......
Page 22: ...22 SNOWBLOWER P 992 10 See upper auger compo nents on page 47 170 03777...
Page 25: ...25 SNOWBLOWER P 992TRC 10 170 04955 See upper auger compo nents on page 47...
Page 28: ...28 SNOWBLOWERS P 980 P 1020 P 1040 10 170 03785 See upper auger compo nents on page 47...
Page 35: ...35 SEMI INDUSTRIAL CHUTE PSIG 92104 10 170 03455...
Page 37: ...37 INDUSTRIAL CHUTE PCG 92104 10 170 03485...
Page 39: ...39 HYDRAULIC TELESCOPIC CHUTE PCT 92104 10 170 04071R4...
Page 41: ...41 HYDRAULIC TELESCOPIC CHUTE PCTC INDR 10 170 05401...
Page 59: ......