ProJet 3-D Modelers Quick Reference Manual Download Page 4

OPERATION

Submit Test Build 

 (B1) 

(B2) 

(B3) 

P

(B4)

(B5) 

P

X (B6) 

P

(B7)

X (B8)

NOTE: It is recommended to submit a Test Build prior to each build job.

Build Demo

(C1)

(C2)

(C3) 

P

(C4)

(C5)

P

(C6)

NOTE: Refer to 3dpedia, Projet HD 3-D Modeler  User Guide, under the operation section for the build process,  
how to remove parts from  the modeler and cleaning parts procedure.

Locate the Sample STL files in 3D Modeling\Samples folder.

Press 

MENU 

Scroll

 

to highlight 

TEST PRINT 

and press 

YES ( ) 

.  The message 

 

PLATFORM 

CLEAR DOOR CLOSED?  Y( ) / N ( )

 

scrolls across the display, 

Press YES ( )  

 if the platform is clear and door 

is closed, otherwise press

 NO( )

 Press 

MENU 

Scroll

 

 to highlight 

BUILD DEMO 

and press 

YES ( ) 

; the system displays 

PLATFORM 

CLEAR? Y/N 

 

.

When platform is clear, press 

YES  ( )  

. The modeler will starts the demo build job.

Quick Reference Guide

Quick Reference Guide

B

EFORE OPERATING THE MODELER, ADHERE TO ALL PERSONAL AND SAFE HANDLING OF MATERIALS DESCRIBED IN THE SAFETY SECTIONS OF THE USER GUIDE.

A

B

A

B

C

B

TEST BUILD

B3

PLATFORM CLEAR
 DOOR CLOSED?
 Y/N

DEMO BUILD

A

B

D

E

F

A

D

OK TO POWER OFF XXX 

Shut Down Modeler

Verify that modeler is not building.

To shut down immediately,  abort the 
current job.

Press MENU,  scroll to SHUTDOWN, press 
YES twice .

When the display shows 

OK TO POWER 

OFF XXX

, press the power switch on the 

rear panel.

To halt shutdown, press ONLINE before 
pressing power switch.

G

E

F

G

B4
C4
C6

 B6,B6,B8,C5

B2
C2

B1
C1

C3

B5
C5

3D Systems

333 Three D Systems Circle
Rock Hill, SC 29730  USA
Telephone (803) 326-4080
TollFree (800) 889-2964

3D Systems – France

Telephone (+33) 1 69 35 17 17

3D Systems – Germany

Telephone (+49) 6151 357-0

3D Systems – Italy, Spain and Portugal

Telephone (+39) 039 68904 00

3D Systems-Switzerland

Tel. +41-26-439 95 90

3D Systems – United Kingdom

Telephone (+44) 1442 282 600

3D Systems – Hong Kong

Telephone (+852) 29 23 50 77

3D Systems – Japan

Telephone (+81) 3 5451 1690

3D Systems Contacts

3D Systems Confidential

3-D Modelers 

Summary of Contents for 3-D Modelers

Page 1: ...s electrical service rating before connecting power to the modeler Facility electrical requirement Grounded 1 phase electrical circuit Service rating 100 127 VAC 50 60 Hz 15A max 3D Systems Confidential B C B B A 3 D Modelers NOTE A Ethernet cable is required when connecting from the modeler to the end user s computer shielded C PN 305175 00 Rev C 10 08 TM TM It will be necessary to register your ...

Page 2: ...mmaren Adgangsdør til byggekammer Rakennuskammion luukku Build platform Bauplattform Plate forme de réalisation Plataforma deconstrucción Piattaforma di costruzione Byggplattform Byggeplatform Rakennusalusta Behind A Support material feed slot door Tür zur Stützmaterialzufuhr Porte de la fente de rechargement dumatériau des supports Puerta con ranura de alimentación para el material del soporte Sp...

Page 3: ... follow MSDS guidelines and local regulations regarding handling and disposal of regulated materials Keep disposal records if local law requires Press PAUSE and open waste drawer and remove full cartridge bins Remove the material waste bag Replace white liner in left bin and black liner in right bin if the liners are contaminated Replace waste bag Close drawer and Press RESUME to resume build Quic...

Page 4: ...HERE TO ALL PERSONAL AND SAFE HANDLING OF MATERIALS DESCRIBED IN THE SAFETY SECTIONS OF THE USER GUIDE A B A B C B TEST BUILD B3 PLATFORM CLEAR DOOR CLOSED Y N DEMO BUILD A B D E F A D OK TO POWER OFF XXX Shut Down Modeler Verify that modeler is not building To shut down immediately abort the current job Press MENU scroll to SHUTDOWN press YES twice When the display shows OK TO POWER OFF XXX press...

Reviews: