Production Basics 1000-1711 Assembly Manual Download Page 15

Production Basics, Inc.     Massachusetts, USA     800.318.2770     617.926.8100      Fax: 617.926.8010      www.pbasics.com

ASSEMBLY VIDEOS AVAILABLE ON-LINE http://video.pbasics.com 

1.  If installing cabinet, start with Step 2. Remove the drawer 

from the chassis by extending drawer and pushing 
down/up on the black tabs on both sides of the drawer 
and pull the drawer forward.

2.  If not using locks, skip to Step 3. Using the allen wrench, 

punch out the lock knock-out on the front side of the 
drawer or cabinet. Assemble lock mechanism as shown. 
Ensure the unthreaded part of the lock and key teeth 
face upward. 

3.  Insert a Basic Bolt from the inside of the drawer  or 

cabinet chassis and secure with Basic Nut, turning one 
revolution. Repeat for all four corners. 

4.  Insert attached Basic Nuts into Worksurface Support 

Rail channel and turn Basic Bolt 90 degrees clockwise to 
grip. Position chassis under worksurface as desired and 
tighten bolts.

a. If stacking items, insert small bolt from above into 

the pre-drilled hole in bottom back of chassis and 
lightly secure with nut and washer.  

b.  Align second chassis’ back keyhole slot with nuts 

and pull forward. This will help you support the 
drawer while securing other nuts and bolts for 
stacking drawers. 

c.  Give 

all

 nuts and bolts a final tightening.

5.  Push in drawer slides on chassis and insert complete 

drawer into chassis.

DRAWERS & SUSPENDED CABINET: 

C-LEG AND EASY-LIFT, DUAL LEG UNITS

Item Numbers 8600, 8605, 8607, 8610, 8613, 8615, 8617

P A R T S   A N D   H A R D W A R E

Q U A N T I T Y

Drawer

1

Drawer or Cabinet Chassis

1

Lock Mechanism 

(if ordered)

1

Keys 

2

Basic Bolts

4

Basic Nuts 

4

Bolts (used for stacking drawers)

4

Kep Nuts (used for stacking drawers) 

4

Washers (used for stacking drawers) 

4

7/32 Allen Wrench

1

Other Items Needed (not included)

Phillips head screwdriver
Open end wrench

Keyhole details for 
stacking drawers 

Use hole set for hanging 
first drawer -step 3

1.  If installing cabinet, start with Step 2. Remove the drawer 

from the chassis by extending drawer and pushing 
down/up on the black tabs on both sides of the drawer 
and pull the drawer forward.

2.  If not using locks, skip to Step 3. Using the allen wrench, 

punch out the lock knock-out on the front side of the 
drawer or cabinet. Assemble lock mechanism as shown. 
Ensure the unthreaded part of the lock and key teeth 
face upward. 

3.  Insert a Basic Bolt from the inside of the drawer  or 

cabinet chassis and secure with Basic Nut, turning one 
revolution. Repeat for all four corners. 

4.  Insert attached Basic Nuts into Worksurface Support 

Rail channel and turn Basic Bolt 90 degrees clockwise to 
grip. Position chassis under worksurface as desired and 
tighten bolts.

a. If stacking items, insert small bolt from above into 

the pre-drilled hole in bottom back of chassis and 
lightly secure with nut and washer.  

b.  Align second chassis’ back keyhole slot with nuts 

and pull forward. This will help you support the 
drawer while securing other nuts and bolts for 
stacking drawers. 

c.  Give 

all

 nuts and bolts a final tightening.

5.  Push in drawer slides on chassis and insert complete 

drawer into chassis.

DRAWERS & SUSPENDED CABINET: 

C-LEG AND EASY-LIFT, DUAL LEG UNITS

Item Numbers 8600, 8605, 8607, 8610, 8613, 8615, 8617

Black tabs- push up/down to release drawer

Keyhole details for 
stacking drawers 

Use hole set for hanging 
first drawer -step 3

Step 1

Step 2

Step 3

Steps 4-5

• Note: Drawer locks are sold separately.

1602A101

15

Summary of Contents for 1000-1711

Page 1: ...1000 1711 Workstations Assembly Tips Review entire instruction manual before proceeding Assembly How to Videos available on line http video pbasics com Production Basics name plate indicates front of...

Page 2: ...can no longer see the caster stem Ensure caster is completely tightened 6 Lay Frame on a flat level surface channel side up a For Side by Side Stations lay Frames next to each other 7 Insert Basic Nu...

Page 3: ...s by attaching the Frame Alignment bracket using Basic Nuts Bolts 6 For corners workstations ordered with casters use 2 Basic Bolts Nuts to attach the 5th caster to the back corner of the workstation...

Page 4: ...2 Basic Bolts into bottom of adjustable leg determining height Screw in leveling foot 2 Insert three 3 tek Screws through pre drilled holes in Top Bracket to outside of each existing C Leg that joins...

Page 5: ...the worksurface Add washer and nut then tighten 3 Ground other end of wire to electrical ground 4 For additional information on grounding contact your company s ESD manager or the ESD Association at...

Page 6: ...lts Repeat for other Overhead Arm 5 Insert 4 Basic Bolts from bottom into light mounting plate Secure with 4 Basic Nuts with grooves facing down Turn only one revolution 6 Position light unit with cor...

Page 7: ...o Overhead Arm mounting plate into frame channel of workstation or Uprights and turn Basic Bolt 90 degrees clockwise to grip Top of mounting plate should be flush with top of frame cross member Tighte...

Page 8: ...the width of the Overhead Arms Insert the Basic Nut into the Overhead Arm channel turn bolt 90 degrees and tighten 3 Ensure an end cap is secure on each end of the Track and there is a brake position...

Page 9: ...4 Alternate mounting to RTW Easy Lift or existing work table with a 1 25 thick worksurface use enclosed bracket shown left to mount Power Rail to your worksurface Secure under the worksurface with woo...

Page 10: ...Board Item Numbers 8716 8719 Multi Panel Enclosures Item Numbers 8776 8797 GLOBAL INSTALLATION These instructions apply to the following accessories Tool Shelf and Bin Rail Item Numbers 8492 8494 Univ...

Page 11: ...sion 2 7 32 Allen Wrench 1 P A R T S A N D H A R D W A R E Q U A N T I T Y Paper Roll Bar 1 Brackets 2 Bar Clip 2 Basic Bolts 4 Basic Nuts 4 7 32 Allen Wrench 1 Paper Roll Bar Brackets 1 Insert Basic...

Page 12: ...T S A N D H A R D W A R E Q U A N T I T Y Laminate Shelf 1 Brackets 2 Cross Bar 1 Basic Bolts 4 Basic Nuts 4 Wood Screws 8 7 32 Allen Wrench 1 Other Items Needed not included Phillips head screwdriver...

Page 13: ...8485 8486 8488 8489 Left Right P A R T S A N D H A R D W A R E Q U A N T I T Y Laminate Shelf 1 Brackets 3 Shelf Cross Bar 1 Basic Bolts 6 Basic Nuts 6 Wood Screws 10 7 32 Allen Wrench 1 Other Items N...

Page 14: ...ition brackets as shown Insert Basic Nuts attached to shelf bracket tabs into frame channel Notches indicate top of bracket Turn Basic Bolt 90 degrees clockwise to grip Measure or use a level to ensur...

Page 15: ...Nuts 4 Bolts used for stacking drawers 4 Kep Nuts used for stacking drawers 4 Washers used for stacking drawers 4 7 32 Allen Wrench 1 Other Items Needed not included Phillips head screwdriver Open en...

Page 16: ...back of your Flat Screen Monitor Arm sold seperately through the mounting plate and then through the monitor The Flat Screen Monitor Arm mounting plate should be sandwiched between the Add on Keyboard...

Page 17: ...surface Support Rails on your workstation as shown Turn Basic Bolt 90 degrees clockwise to grip Tighten the bolts 4 Proceed with enclosed instructions for your keyboard a For RTW Tables insert wood sc...

Page 18: ...or C Leg and Easy Lift workstations insert a Basic Bolt through the two 2 large holes on top of each bracket from step 1 Secure with a Basic Nut Turn one revolution a For RTW use wood screws to attach...

Page 19: ...s 2 U Bolt Retainer Plate 2 Plate Support Footrest Plate U Bolt Retainer Plate 1 Prepare brackets as shown Brackets are LEFT and RIGHT specific Adjust bracket according to operator comfort and depth o...

Reviews: