60
>>
MOUNTING THE LINER LOCKING TRACK
Before beginning
to mount the liner
locking track,
make sure that the
structure has been
correctly assembled.
To do this:
w
use a spirit level
to verify that the
structure is level
around the entire
periphery,
w
check that the
diagonals are equal
in length,
w
correct any
imperfections
before continuing.
CAUTION
w
Position 2 liner locking track corner
pieces in each corner. (You will fi nd
the parts in the liner/ waterproofi ng
kit). You will need to trim an
interlocking pin off each corner piece.
Make sure that the 2 corner parts are
level with each other and fl ush with
the top of the wall. A gap of a few
mm between the two parts is not
problematic. Use 4x35 stainless steel
screws from bag H.
TIPS:
w
The track should be
perfectly fl ush with the
top of the wall.
w
Before fi xing the track
in position, pre-drill
the holes using the
Ø 4mm drill bit
provided.
(bag J)
w
Remember to deburr
the track after making
the cuts.
w
Take care not to
overtighten to ensure
that the screws do not
break through the track.
Figure 27
Figure 26
w
Continue to mount the
locking track using the
lengths provided, these
should abut the locking
track junctions (fi g 28).
Insert a screw (stainless
steel 4x35 from bag H) at
20cm intervals. Locking
track junctions do not
necessarily line up with the
posts.
Towards the end, it will
be necessary to trim the
lengths. Cut the length
to size between two liner
locking junctions then
bend the track to allow
the junction pins to fi t into
place.
Figure 28
»
INSTALLATION INSTRUCTION
/ RECTANGLE