![Procom FBNSD400RT Series Owner'S Operation And Installation Manual Download Page 12](http://html.mh-extra.com/html/procom/fbnsd400rt-series/fbnsd400rt-series_owners-operation-and-installation-manual_1608913012.webp)
www.usaprocom.com
200228-01A
12
INSTALLATION
CLEARANCES TO COMBUSTIBLES
Figure 6 - Minimum Clearance for
Combustible to Wall and Ceiling
MANTEL
Assemble and install your mantel at this time. Mantel instructions are inside
the mantel box. Mantel must be in place before you connect to the gas supply.
WARNING: You must main-
tain the minimum clearances. If
possible, provide greater clear-
ances from floor, ceiling, and
adjoining wall. Measure from
outermost point of heater.
Note: This firebox can not be installed in an
existing fireplace. Install this firebox only in
a ProCom Heating, Inc. mantel accessory
approved for this product.
Minimum Clearances For Side
Combustible Material, Side Wall
and Ceiling
A. Clearance from the side of the fireplace to
any combustible material and wall should
not be less than 12" (see Figure 6).
B. Clearance from the top of the fireplace to
the ceiling must not be less than 48".