Page 33
Please go through the following checklist before powering up the power supply(s).
The installation meets the requirements in CLG-Section 2.
Make sure all connections to the terminal blocks are secure (potential danger of short circuit).
Label your AC and DC wiring accordingly so that any service personnel can identify them easily.
Do not make modifications while in operation. Risk of electrical shock can be fatal.
Questions?
SP - SECTION 5