S T R O N G
|
R E L I A B L E
S E C U R E
INSTALLATION GUIDE
P1000 PRO-CELL2015 DODGE CHARGER
pro-gard.com
800.480.6680
Page 1: ...S T R O N G R E L I A B L E S E C U R E INSTALLATION GUIDE P1000 PRO CELL 2015 DODGE CHARGER pro gard com 800 480 6680...
Page 2: ...on the Driver and Passenger side These will be reinstalled after bracket installation Note From the head liner down the trim is held in place by snap fasteners but the top of the trim panel is held i...
Page 3: ...ehicle near B pillar with screws B Reinstall the OEM Rear Door Scuff Plates on the Driver and Passenger side See Fig 5 Note The Door Scuff Trim Plates go on top of the ABS Floor Pan Note Minor Trimmin...
Page 4: ...he B pillar bracket so the bottom tab fits into the T slot on the B pillar and the formed edges wrap around the B pillar Using the supplied Self Drilling screws 3X162 secure the B pillar X Drilling B...
Page 5: ...t the partition into the vehicle lift and position the partition so that it alines with the Partition Mounting Plate and Center Support Bracket Secure the Partition using the supplied 1 4 20 x 3 4 Car...
Page 6: ...te and drill holes to secure each area using the 3X61 carriage bolts and the 3X16Z whiz nuts XVI Air Bag wing Installation A The Filler Wings and their mounting hardware are packed in separate box mar...
Page 7: ...25 7 7 7 7 7 7 8 8 8 6 6 6 6 4 4 4 5 1 4 4 4 6 6 6 6 6 2 4 11 12 23 25 22 24 8 8 8 8 9 9 15 15 9 14 14 14 8 8 13 21 21 21 19 19 19 19 17 17 17 17 21 8 8 8 8 9 10 18 18 18 18 16 PARTS LIST DESCRIPTION...