7
Assembly
Instructions
Connect 2 x Connecting Rod (46L/R) to the Joint of Belt Pulley and Crank (67) with
2 x Pedal Bolt (55L/R), 2 x d16 Wave Washer (20), 2 x Spring Washer 1/2" (56) and 2 x Nylon Nut
1/2" (57L/R).
Note: Please pay attention to the Right and Left of these parts. Do not mix them up. There is L or R
marking on the dome of the Pedal Bolts (55L/R). Tighten 55L counter-clockwise, and 55R clockwise.
Step 4
/
/
5
5
5
/
/
/
/