5
Installations
1.
Installation Requirements
• For easier maintenance, operation, and
improved ventilation, be sure to install the
GP at least 100 mm [3.94 in.] away from
adjacent structures and other equipment.
• Be sure that the ambient operation temper-
ature and the ambient humidity are within
their designated ranges. (Ambient opera-
tion temperature: 0 to 50°C, Ambient
humidity: 10 to 90%RH, Wet bulb temper-
ature: 39°C max.)
When installing the GP on the panel of a cab-
inet or enclosure, “Ambient operation tem-
perature” indicates both the panel face and
cabinet or enclosure’s internal temperature.
• Be sure that heat from surrounding equip-
ment does not cause the GP to exceed its
standard operating temperature.
2.
GP Installation
(1) Create a Panel Cut following the dimen-
sions in the table below.
(2) Confirm that the installation gasket is
attached to the GP unit and then place
the GP unit into the Panel from the front.
• It is strongly recommended that you
use the installation gasket, since it
absorbs vibration in addition to repel-
ling water.
For the procedure for replacing the
installation gasket, refer to “GP3000
Series Hardware Manual”.
(3) The following figures show the four (4)
fastener insertion slot locations. Insert
each fastener’s hook into the slot and
tighten it with a screwdriver. Insert the
installation fasteners securely into the
insertion slot recess.
100
[3.94]
100
[3.94]
100
[3.94]
100
[3.94]
Unit:mm[in.]
100
[3.94]
100
[3.94]
100
[3.94]
Panel Face
Inside Cabinet
X
Y
Panel thickness
118.5
[4.67
]
92.5
[3.64
]
1.6[0.06]
to
5.0[0.20]
Unit: mm [in.]
X
GP
Y
Under
4-R3[0.12]
Panel
thickness
+1
-0
+0.04
-0
+1
-0
+0.04
-0
Left Side
Insertion
Slots
Right Side