background image

5

Installation, maintenance and operation check record

Location:
Installation date:

Installation test duration:

Installed by:

20__

20__

20__

20__

20__

Month Test Sign

Date

Sign

Date

Sign

Date

Sign

Date

Sign

Date

1

Short

2

Short

3

Short

4

Short

5

Short

6

1 hr

7

Short

8

Short

9

Short

10

Short

11

Short

12

3hr

Reviews: