P
P
r
r
o
o
-
-
B
B
e
e
l
l
L
L
t
t
d
d
F
F
r
r
e
e
e
e
w
w
a
a
y
y
R
R
a
a
n
n
g
g
e
e
S
S
y
y
s
s
t
t
e
e
m
m
U
U
s
s
e
e
r
r
G
G
u
u
i
i
d
d
e
e
H
H
U
U
-
-
F
F
r
r
e
e
e
e
w
w
a
a
y
y
R
R
a
a
n
n
g
g
e
e
S
S
y
y
s
s
t
t
e
e
m
m
U
U
s
s
e
e
r
r
G
G
u
u
i
i
d
d
e
e
1
1
C
C
o
o
n
n
t
t
e
e
n
n
t
t
s
s
1
1
I
I
n
n
t
t
r
r
o
o
d
d
u
u
c
c
t
t
i
i
o
o
n
n
5
5
1.1
General points
5
1.2
Control
6
1.3
Environmental
6
1.4
Problems?
6
1.5
The right choice
7
2
2
I
I
n
n
s
s
t
t
a
a
l
l
l
l
a
a
t
t
i
i
o
o
n
n
9
9
2.1
Door removal
9
2.2
Power supply removal
10
2.3
Signal rear panel removal
12
2.4
Removal and replacement of modules
13
2.5
Cable connections
14
2.6
Control rear panel connections
16
2.7
Video references - BNC sockets (looping)
18
2.8
Setting the AES reference
19
2.9
Setting the level switch
20
2.10
Setting the destination assign switch
22
2.11
LED indications
22
2.12
Freeway
control card
24
2.13
Setting the reset switch
26
3
3
H
H
a
a
r
r
d
d
w
w
a
a
r
r
e
e
c
c
o
o
n
n
f
f
i
i
g
g
u
u
r
r
a
a
t
t
i
i
o
o
n
n
2
2
7
7
3.1
Router details
27
3.2
Port definitions
31
3.3
Controller configuration
33
3.4
Software controllable processes
35
4
4
C
C
o
o
n
n
t
t
r
r
o
o
l
l
s
s
y
y
s
s
t
t
e
e
m
m
o
o
p
p
e
e
r
r
a
a
t
t
i
i
o
o
n
n
3
3
7
7
4.1
Master and slave module details
37
4.2
Master router dual control and changeover
37
4.3
Operating modes
38