![PRO AIR TPK 21 LT Functional Description And Operating Instructions Download Page 13](http://html1.mh-extra.com/html/pro-air/tpk-21-lt/tpk-21-lt_functional-description-and-operating-instructions_1603876013.webp)
6.3 Procedure for installation
6.4 Mounting
7
If using compressed air of unknown quality, use a condensate separator or particle
filter. Additional components must be suitable for the intended use!
In EMC-critical environments the measuring chamber should be electrically isolated
from the metal pipes of the compressed-air network. The use of a PTFE or
Polypropylene double nipple is an example of a suitable solution.
Installation involves the following steps:
-
Mounting of the device, if necessary.
-
Connection to the compressed-air network
-
Adjustment of the filter choke, if necessary
-
Connection to the power supply
-
Initial start-up
-
Setting of the switching points
-
Testing and function control
If the device is operated as a portable device or is connected using a standard coupling, as
described below, no further mounting is required.
When mounting onto a machine, the device can be kept level by using mounting brackets. A
drilling template can be found in the appendix of this manual.
Summary of Contents for TPK 21 LT
Page 2: ......
Page 6: ......
Page 114: ...108...
Page 115: ...109 13 APPENDIX...
Page 122: ...13 5 1 Connecting optional accessories 116 15 5 1 Connecting optional accessories 120 DC 24 V...