If the packaging is damaged, then such damage must always be reported on the delivery slip to the freight carrier 
– a “simple acknowledgement” to the delivering freight company excludes the recognition of any damage in 
transit. The same applies if any packages are missing according to the delivery slip. 

 

The pallet must always be picked up from the narrow side with forks inserted fully to the end of the pallet.  

 

Our panels weigh approx. 65 kg per m² of area. Warning: Risk of injury! 

 

Only open the pallet at the installation site, in order to prevent damage during transportation to the site. 

 

Do not use pointed or sharp objects such as knives when opening the pallet, as these could damage the 
panels/doors. Please use caution! 

 

Dispose of packaging materials in an environmentally appropriate manner, or reuse them. 

 

If the material is not used or installed immediately, it must be stored at a suitable location; please ensure that no 
water spray can form or penetrate the rack  
-> do not store outdoors. 

 

General information 

 

 

Do not install damaged components – this will immediately void the warranty and usability certificate. 

 

Always observe building law regulations and guidelines, as well as instructions from the responsible building 
authority and the responsible commissioned fire protection expert. 

 

As the installing technician, you should only issue an unrestricted manufacturer's declaration of compliance with 
the building approval if installation was completed in a compliant manner, and if all necessary fittings have been 
installed. Note any necessary deviations on the declaration, if these are significant in scope. 

 

Assembly / scope of delivery  

 

 

Our delivery is shipped with a scope of delivery required for installation by our own technicians or certified 
contracting companies. 

 

Setup in compliance with valid approvals requires a level of technical expertise which cannot be conveyed fully in 
an assembly manual. We train technicians on request, and certify them for professional installation of our 
products. 

 

General safety information 

 

 

 This operating / assembly manual must always be stored at the location where the barrel container will be used. 

     Legally required safety information must be posted in an area visible to users. 

     All safety and hazard notices and the type plate must be kept in legible condition. 

 

Functional test, safety technology inspection, 
care and maintenance 

 

 

The container should be maintained at least once annually and checked for proper function. We recommend that 

you  complete  a  functional  check  (visual  inspection)  each  month.  The  safety  technology  inspection  can  only  be 
completed with the necessary level of care by one of our authorised employees, since sufficient experience and  
comprehensive expertise are essential for this inspection. 

     Commonly available, mild household cleaners can be used for external cleaning of the container. 

     The door locking mechanism should be oiled 2 x per year. 

     The container must be protected against water, moisture penetration, or water spray. 

     If relevant damage to the safety technology is found, then the containers must be repaired with original parts  

       before further use. 

Summary of Contents for PRIOBOX

Page 1: ...1 Assembly and operating manual PRIOBOX EP A 11144 Last updated 01 2022...

Page 2: ...ontents Introduction 4 Assembly manual 6 1 Setup 6 2 Connecting the elements 6 3 Installing the ventilation duct 7 4 Installing the doors 7 5 Shutoff device installation 8 Warranty transfer declaratio...

Page 3: ...warranty guarantees We expressly reserve the right to make technical modifications for the purpose of improving our product or as required due to changes in the law even without providing separate no...

Page 4: ...itute for Construction MPA Dresden Permitted set up location Subsurface must be flat Indoors frost free dry Subsurface must be suitable load bearing capacity classification Special features Panels and...

Page 5: ...ed in a compliant manner and if all necessary fittings have been installed Note any necessary deviations on the declaration if these are significant in scope Assembly scope of delivery Our delivery is...

Page 6: ...his purpose before connecting the panel elements together Align the floor elements to the baseboards and install The wall base and cover elements have cup holes assemble using carriage bolts and nuts...

Page 7: ...e cover plate 4 Installing the doors Screw the enclosed hinges on the doors Holes are pre drilled for this purpose Lift the door leaves with the hinges onto the cabinet and screw the hinges into the h...

Page 8: ...ay with grate on the base The barrel container can be filled 5 Installing the shut off device The position is specified in the cover elements by the drill holes The dimensions of the enclosed doubling...

Page 9: ...aims for personal injury and property damage are excluded if they are caused by one or more of the following Container is not used according to its intended purpose Improper assembly commissioning ope...

Reviews: