background image

340-506-EN

9

Printed in USA 3/06 © 2006

Universal Rapid Toaster

340-TCE

Programming

NOTE: Improper adjustments can affect the operation of the unit. Do NOT attempt to adjust any unlisted settings without 
authorization from your management.
Each bread product must be adjusted independently on each toasting chamber.

To enter the Program Mode, press and hold the 
PRINCE CASTLE Logo button for 6 seconds.
NOTE: During programming, press the PRINCE 
CASTLE Logo button at any time to move backward 
one step in the program.

PRINCE CASTLE 

Logo Button

1

A. Using the UP and DOWN scroll buttons, scroll 

through the main menu to find the bread product 
you want to change.

B. Press the INFORMATION button to select the 

product.

C. Use the UP and DOWN scroll buttons to scroll 

through the product’s settings (e.g., Toast Time, 
Toast Power, etc.).

D. Press the INFORMATION button to select the 

desired setting.

NOTE: For the recommended toast quality, change 
only the Toast Time settings. For minor adjustments to 
the toast quality, use the LIGHT/DARK buttons.

INFORMATION 

Button

UP and DOWN
Scroll Buttons

2

Cleaning

This unit is not watertight. Do not clean with a water jet/jet spray. Do not immerse the unit in water.
Only use URT Cleaning Tool with a sponge pad to clean the platens. Do NOT use anything abrasive because it will scratch the 
platens, which could cause bun sticking. Do not use abrasive materials such as scrapers, steel wool, etc. to clean the BBLZ or 
exterior of the unit, as damage to the surface could occur.
Do NOT use any unapproved agents or cleaning solutions inside or on the surfaces of the toaster unit.

CAUTION

Throughout the day, wipe the BBLZ periodically with a 
clean, sanitized cloth. It is important to wipe the BBLZ 
during Changeover.

FIRE HAZARD! Do NOT allow the dry soft cloth to 
touch the heating apparatus inside the toaster 
unit!

WARNING

1

A. At the end of each day when cleaning the grills, 

prepare the URT Cleaning Tool with a non-abrasive 
sponge pad.

B. Dip the URT Cleaning Tool into the High 

Temperature Grill Cleaning Solution.

2

Summary of Contents for 340-TCE

Page 1: ...s this warranty and all work must be performed by an authorized Prince Castle Service Agent All labor shall be performed during regular work hours Overtime premium will not be covered Travel charges a...

Page 2: ...at 1 800 722 7853 or 630 462 8800 to arrange for a replacement unit 1 NOTE When installing this unit the ambient temperature at the mounting site should not exceed 37 8 C 100 F Your toaster may consis...

Page 3: ...in position NOTE If yours is a single unit proceed to Step 10 Mounting Holes Align BBLZ Pushed Back into Position 5 A On the rear chamber push the bun chute into the toaster from the back toward the f...

Page 4: ...sitioned together operate as one toaster Each chamber has its own power switch and Control Panel A Turn the On Off switch es located below the control panel on the side of the unit s to ON After 20 se...

Page 5: ...prep table Load the buns so that the cut side makes contact with the grey platen cut side in There is a separate slot for the club flatbread section that allows toasting on both sides B Press START bu...

Page 6: ...6 EN Universal Rapid Toaster 340 TCE Loading Diagram Radiant Heater Radiant Heater Cut Side Out Cut Side Out Radiant Heater Radiant Heater Cut Side Out Cut Side Out Crown Cut Side In Heel Cut Side In...

Page 7: ...eels When Bagels are to be toasted change one chamber to BAGEL and begin the toasting process 15 minutes before changeover convert one chamber to BUNS REGULAR MENU Bun Loading Unlike other rapid toast...

Page 8: ...ODUCT Button 2 I INFORMATION Button and UP and DOWN Scroll Buttons While holding the INFORMATION button press the UP and DOWN scroll buttons to view the settings and actual readings Toast Power operat...

Page 9: ...lity change only the Toast Time settings For minor adjustments to the toast quality use the LIGHT DARK buttons INFORMATION Button UP and DOWN Scroll Buttons 2 Cleaning This unit is not watertight Do n...

Page 10: ...ion of the platen and both sides of the club platen Add more High Temperature Grill Cleaning Solution to the URT Cleaning Tool as necessary C Place a sanitized cloth at the end of the Cleaning Tool an...

Page 11: ...in blinking and corresponding heater should begin to heat Verify that heat is being generated by the heater 6 Press the down arrow to move to relay 2 and heater 2 Verify that the relay is operating Th...

Page 12: ...l an appropriate combination is reached Relay is shorted Remove side panel to view relay When the unit is not calling for heat the LED on the relay should not be lit Measure the voltage across the out...

Page 13: ...he PRODUCT button Hold these buttons until the display reads Heater Test 4 Press the INFORMATION button 5 The LED on relay 1 should begin blinking and corresponding heater should begin to heat Verify...

Page 14: ...ace temperature probe Relay is shorted Remove side panel to view relay When the unit is not calling for heat the LED on the relay should not be lit Measure the voltage across the output terminals of t...

Page 15: ...e encoder 6 Use the UP arrow button scroll to Volume Level 7 Press both the right and left arrows at the same time The display will change to Set Home Switch 8 Locate the two set screws on the collar...

Page 16: ...Printed in USA 3 06 2006 16 340 506 EN Universal Rapid Toaster 340 TCE Exploded View and Parts List...

Page 17: ...340 506 EN 17 Printed in USA 3 06 2006 Universal Rapid Toaster 340 TCE Wiring Diagram...

Page 18: ...355 East Kehoe Blvd Carol Stream IL 60188 USA Telephone 630 462 8800 Fax 630 462 1460 Toll Free 1 800 PCASTLE www princecastle com Printed in 3 06 Prince Castle Inc...

Reviews: