background image

Printed in USA 3/06 © 2006

2

340-506-EN

Universal Rapid Toaster
340-TCE

Safety Information

Indicates information important to the proper operation of 
the unit. Failure to observe may result in damage to the 
equipment and/or severe bodily injury or death.

Indicates information important to the operation of the unit. 
Failure to observe may result in damage to the equipment.

WARNING

CAUTION

Important

Prince Castle reserves the right to change specifications 
and product design without notice. Such revisions do not 
entitle the buyer to corresponding changes, improvements, 
additions or replacements for previously purchased 
equipment.

Installation

Remove the unit from the carton and inspect for signs 
of damage. If there is damage to the unit:
• Notify the carrier within 24 hours of delivery,
• Save carton and packaging materials for inspection 

purposes,

• Contact your local dealer, or if purchased directly, the 

Prince Castle Sales Department at 1-800-722-7853 
or 630-462-8800 to arrange for a replacement unit.

1

NOTE: When installing this unit, the ambient 
temperature at the mounting site should not exceed 
37.8°C (100°F).
Your toaster may consist of one Universal Rapid 
Toaster unit or two units positioned together to perform 
as an assembly. Single units must be assembled with 
a Buffered Bun Landing Zone (BBLZ) only. Two-unit 
assemblies must be equipped with a BBLZ and a bun 
chute that carries the product from the rear unit to the 
BBLZ.

2

A. For two-unit installations, designate one unit to be 

the “front” chamber. Orient the chamber(s) so that 
the Club Section is positioned closer or farther from 
the loader’s workstation — most stores prefer the 
Club Section closer, but the URT is designed to be 
configured either way.

B. Slide the BBLZ into the single unit or front chamber 

of a two-unit assembly by pushing the BBLZ into the 
unit from the front towards the back.

3

Push the BBLZ about halfway into position and 
connect the wire assembly from underneath the BBLZ 
to the connector on the base of the unit. This 
connection provides power to heat the BBLZ. 

Wire Assembly Under BBLZ

4

Summary of Contents for 340-TCE

Page 1: ...s this warranty and all work must be performed by an authorized Prince Castle Service Agent All labor shall be performed during regular work hours Overtime premium will not be covered Travel charges a...

Page 2: ...at 1 800 722 7853 or 630 462 8800 to arrange for a replacement unit 1 NOTE When installing this unit the ambient temperature at the mounting site should not exceed 37 8 C 100 F Your toaster may consis...

Page 3: ...in position NOTE If yours is a single unit proceed to Step 10 Mounting Holes Align BBLZ Pushed Back into Position 5 A On the rear chamber push the bun chute into the toaster from the back toward the f...

Page 4: ...sitioned together operate as one toaster Each chamber has its own power switch and Control Panel A Turn the On Off switch es located below the control panel on the side of the unit s to ON After 20 se...

Page 5: ...prep table Load the buns so that the cut side makes contact with the grey platen cut side in There is a separate slot for the club flatbread section that allows toasting on both sides B Press START bu...

Page 6: ...6 EN Universal Rapid Toaster 340 TCE Loading Diagram Radiant Heater Radiant Heater Cut Side Out Cut Side Out Radiant Heater Radiant Heater Cut Side Out Cut Side Out Crown Cut Side In Heel Cut Side In...

Page 7: ...eels When Bagels are to be toasted change one chamber to BAGEL and begin the toasting process 15 minutes before changeover convert one chamber to BUNS REGULAR MENU Bun Loading Unlike other rapid toast...

Page 8: ...ODUCT Button 2 I INFORMATION Button and UP and DOWN Scroll Buttons While holding the INFORMATION button press the UP and DOWN scroll buttons to view the settings and actual readings Toast Power operat...

Page 9: ...lity change only the Toast Time settings For minor adjustments to the toast quality use the LIGHT DARK buttons INFORMATION Button UP and DOWN Scroll Buttons 2 Cleaning This unit is not watertight Do n...

Page 10: ...ion of the platen and both sides of the club platen Add more High Temperature Grill Cleaning Solution to the URT Cleaning Tool as necessary C Place a sanitized cloth at the end of the Cleaning Tool an...

Page 11: ...in blinking and corresponding heater should begin to heat Verify that heat is being generated by the heater 6 Press the down arrow to move to relay 2 and heater 2 Verify that the relay is operating Th...

Page 12: ...l an appropriate combination is reached Relay is shorted Remove side panel to view relay When the unit is not calling for heat the LED on the relay should not be lit Measure the voltage across the out...

Page 13: ...he PRODUCT button Hold these buttons until the display reads Heater Test 4 Press the INFORMATION button 5 The LED on relay 1 should begin blinking and corresponding heater should begin to heat Verify...

Page 14: ...ace temperature probe Relay is shorted Remove side panel to view relay When the unit is not calling for heat the LED on the relay should not be lit Measure the voltage across the output terminals of t...

Page 15: ...e encoder 6 Use the UP arrow button scroll to Volume Level 7 Press both the right and left arrows at the same time The display will change to Set Home Switch 8 Locate the two set screws on the collar...

Page 16: ...Printed in USA 3 06 2006 16 340 506 EN Universal Rapid Toaster 340 TCE Exploded View and Parts List...

Page 17: ...340 506 EN 17 Printed in USA 3 06 2006 Universal Rapid Toaster 340 TCE Wiring Diagram...

Page 18: ...355 East Kehoe Blvd Carol Stream IL 60188 USA Telephone 630 462 8800 Fax 630 462 1460 Toll Free 1 800 PCASTLE www princecastle com Printed in 3 06 Prince Castle Inc...

Reviews: