8 EZ Tower
TM
Owner’s Manual, Rev A
EZ Tower Parts:
Description
Quantity
Tower Base
1
21 ft (6.4 m) Guy Wire Set (wire guy wire attachment plate)
1
30 ft (9.1 m) Guy Wire Set (wire guy wire attachment plate)
1
M10 x 65 mm Bolt
1
M10 Locknut
1
Cable Thimbles
8
Cable Clamps
16
Tower Base Earth Spikes
4
Arrowhead Earth Anchors
4
Earth Anchor Driving Rod
1
1- 7/8 in x 72 in (4.76 cm x 1.8 m) Tower Tubes
4
1- 7/8 in x 48 in (4.76 cm x 1.2 m) Tower Tubes
1
1- 7/8 in x 42 in (4.76 cm x 1.0 m) Tower Tubes
1
EZ TOWER PARTS & REQUIRED TOOLS
IMPORTANT:
If any parts are missing from the list
shown above, call Primus Wind Power.
EZ Tower Required Tools:
Description
Quantity
100 ft (30.5 m) Measuring Tape
1
5/16 in (.8 cm) Wrench, Socket or Nut Driver (preferred)
1 or 2
9/16 in (1.4 cm) Wrench or Socket
2
10 kg Hammer
1
Mallet
1
Pliers
1
Carpenters Level
1
Safety Glasses
1 pair/person
Protective Gloves
1 pair/person
IMPORTANT:
Before you begin installation of your EZ
Tower be sure to have all parts and required tools.
Summary of Contents for EZ Tower
Page 2: ......
Page 22: ...22 EZ TowerTM Owner s Manual Rev A ...