Installation
ATTENTION: Hire a professional to install your roaster. This manual must
be read completely through prior to any installation. Check with local
building authorities for their local codes & installation requirements prior to
installation.
i. Electrical
ATTENTION: Use a licensed electrical company when installing the
electrical on your Primo roaster.
Consult your licensed electrician to ensure proper installation of either the 110 V or
220 V, based off requested voltage. If using 220v a 3 prong 220v will not be included
and must be wired to the 3 wires from the machine.
ii. Gas
ATTENTION: Use a licensed gas company when installing the gas line on
your Primo roaster.
Local codes, regulations, and/or laws must be followed when doing the gas
installation for the machine.
*Propane roasters must use propane only and are required to use a gas
regulator.
*Have a certified gas worker inspect and double check any gas connection
work you do.*
iii. Roaster Funnel & Cyclone Exhaust Fitting
1. Remove a total of four nut caps (7/16”) from the hopper.
2. Place funnel slide gate in designated position on top of the hopper.
3. Place green bean funnel on top of the funnel slide gate.
4. Before tightening the green bean funnel to the hopper ensure that your funnel
slide gate is operating smoothly. (Slide gate should move with ease.)
5. After the slide gate and green bean funnel are in position you may begin
tightening the four nut caps using a (7/16”) wrench.
6. Finally, slide the exhaust on, connecting the roaster and cyclone via compression
fit.
Summary of Contents for RAVEN XR15
Page 1: ......
Page 5: ...Frontview Scale 1 32 ...
Page 6: ...Leftside view Scale 1 32 ...
Page 7: ...Rearview Scale 1 32 ...
Page 8: ...Rightside view Scale 1 32 ...
Page 9: ...Topview Scale 1 32 ...
Page 10: ...Frontviewwith cyclone Scale 1 32 Roaster to Cyclone Connection Not Pictured Above ...