background image

PRIME DESIGN, A SAFE FLEET BRAND 

 Address: 1689 Oakdale Avenue #102, West St Paul, Minnesota 55118 

 Toll Free: 1.8.PRIME.RACK 

 Fax: 651-552-1799 

 Email: [email protected] 

 Website: www.primedesign.net

TM & © 2020 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6427889, 6764268, 6971563, 8991889, 9415726, 9506292, 9481313, 9776476, 9796340, 10470565, 10486608 AND OTHER PATENTS PENDING

4

Foam Pad

Mounting Bracket

M8 x 25MM Screw

Rear

Front

1

2

M8 Lock Nut

Flat Washer

Rear

Front

T Bolt Stud

VRR3-FT31G-ST B

ASE 

ASSEMBL

Y INSTR

UCTIONS–CHANNEL MOUNTINGS

LOW ROOF LONG WHEEL BASE (148.00”)
FBM ASSEMBLY SEQUENCE

MOUNTING BRACKETS

Apply Anti-Seize to all M8 x 25MM Flat Head Screws and 

install the Channel Mounting Brackets with Foam Pads 

onto the vehicle’s roof mounting holes. Do not tighten 

screws until Step 2.3

1

CHANNELS

2.1

Installer’s Note:

 The Channel orientation differs from the 

typical Prime Design Ford Transit rack installations. Apply 

Anti-Seize to all M8 T Bolt studs, then attach to Mounts 

using the indicated hardware. Do not tighten until Step 2.2

Prior to assembling the Channels and 

hardware, the OEM roof holes must be 

chased using an M8 x 1.25 Chasing or 

Thread Cleaning tap and fluid. Doing so 

will ensure accurate torque is achieved.

Reviews: