PRIME DESIGN, A SAFE FLEET BRAND
▪
Address: 1689 Oakdale Avenue #102, West St Paul, Minnesota 55118
▪
Toll Free: 1.8.PRIME.RACK
▪
Fax: 651-552-1799
▪
Email: [email protected]
▪
Website: www.primedesign.net
TM & © 2020 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6427889, 6764268, 6971563, 8991889, 9415726, 9506292, 9481313, 9776476, 9796340, 10470565, 10486608 AND OTHER PATENTS PENDING
4
Foam Pad
Mounting Bracket
M8 x 25MM Screw
Rear
Front
1
2
M8 Lock Nut
Flat Washer
Rear
Front
T Bolt Stud
VRR3-FT31G-ST B
ASE
ASSEMBL
Y INSTR
UCTIONS–CHANNEL MOUNTINGS
LOW ROOF LONG WHEEL BASE (148.00”)
FBM ASSEMBLY SEQUENCE
MOUNTING BRACKETS
Apply Anti-Seize to all M8 x 25MM Flat Head Screws and
install the Channel Mounting Brackets with Foam Pads
onto the vehicle’s roof mounting holes. Do not tighten
screws until Step 2.3
1
CHANNELS
2.1
Installer’s Note:
The Channel orientation differs from the
typical Prime Design Ford Transit rack installations. Apply
Anti-Seize to all M8 T Bolt studs, then attach to Mounts
using the indicated hardware. Do not tighten until Step 2.2
Prior to assembling the Channels and
hardware, the OEM roof holes must be
chased using an M8 x 1.25 Chasing or
Thread Cleaning tap and fluid. Doing so
will ensure accurate torque is achieved.
Summary of Contents for VRR3-FT31G-ST
Page 1: ......