PRIME DESIGN, A SAFE FLEET BRAND 1689 Oakdale Avenue #102, West St Paul, Minnesota 55118 ▪ Phone: 651-552-8554 ▪ 1.8.PRIME.RACK ▪ Fax: 651-552-1799 ▪ Email:[email protected] ▪ www.primedesign.net
TM & © 2015 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6092974, 6764268, 6971563, 2364879, 8857689, 8511525, 8991889 AND OTHER PATENTS PENDING
4
AR1929
ASSEMBL
Y INSTR
UCTIONS–FBM MOUNTINGS
Rear
Front
Rear
Front
42”
60”
Neoprene Washer (outside)
M6 T-Insert
Neoprene Washer (inside)
Fender Washer
M6 Lock Nut
Right Rear
7.875”
Left Rear
7.875”
Assemble Channel hardware
through roof as shown, but
do not tighten.
0.1
Slide the upper and lower
Channel Connectors into
Channels and align holes
0.2
0.3
Slide Channels onto
Mounting Brackets
0.4
Torque screws to 90 in-lbs
M8 x 40MM Bolt
0.5
Set to specified distances shown below, then torque Mounting
hardware nuts to 80 in-lbs.
FBM3-0057-A
MOUNTING BRACKETS
Summary of Contents for AR1929
Page 1: ......
Page 12: ...USAM AR1929 US01 Rev A 0615...