6
5
Secure the spacer boards with double-sided adhesive tape to the battery cavity on both sides
of the custom nuts. Do not overlap on top of the nuts.
5
6
Rear
Front
Main Frame
Top View
If the spacer boards overlap the nuts, trim the boards with a utility knife or heavy duty scissors
to clear the nuts. Secure with double-sided adhesive tape.
Spacer
Boards
Nuts
Rear
Front
Main Frame
Top View
Spacer Boards
with cuts
Nuts
8
7
Re-install the batteries and the front battery door.
Test the unit by connecting to the docking station. Ensure that it is securely locked and that all
release methods work as intended. Reference Section 2 of this document and the Dahl
Engineering MK II Docking Station user guide for operational instruction.
9
Re-install all peripheral items that may have been removed during installation.
Section 1: Assembly Instructions
per Dahl Engineering (cont.)
6