VV
1 | VV – Manual | AntecControls.com
INTRODUCTION
General
In this manual, you will find information regarding:
•
Venturi Valve (VV) specifications
•
How to install the VV with Constant Volume, Variable
Volume, and Two Position (2P) Switch
•
Detailed description of all options available for each setup
Safety Precautions
1.
Installation work and electrical wiring must be done by
qualified person(s) in accordance with all applicable codes
and standards, including fire-rated construction.
2.
When cutting or drilling into wall or ceiling, do not damage
electrical wiring and other hidden utilities.
3.
Use this unit only in the manner intended by the
manufacturer.
4.
Before servicing or cleaning unit, switch power off at
service panel and lock service panel to prevent power from
being switched on accidentally.
5.
Protect flammable materials nearby when brazing, use
flame and head protection barriers where needed. Always
have a fire extinguisher ready.
6.
The manufacturer assumes no responsibility for personal
injury or property damage resulting from improper handling,
installation, service or operation of the product.
Caution to Contractors
Venturi Valves are not intended for use as temporary heat or
ventilation sources during building construction. The units are
not designed nor equipped to operate in a dusty construction
environment. Internal parts can become coated in construction
dust, resulting in loss of calibration and excess wear on the
product which in turn can contribute to reduced life.
For local area support, please
contact your local Antec Controls
Representative
For more information visit
www.AntecControls.com
This mark indicates an important point for the proper
function of the Venturi Valve. Improper setup may
cause unit failure. Pay close attention to all caution
points throughout this manual.