96-14B / Page 17/18
STEP 2 : HYDRAULIC TAG AXLE STABILIZER LOCKING SYSTEM
MODIFICATION (M5 ONLY) (Fig. 10)
Proceed to the following steps to increase the air springs filling delay to 15 seconds before the hydraulic tag
axle stabilizer locking system application. Previous delay was set to 5 seconds.
Note :
Perform the following procedure only on M5 vehicles.
MATERIAL
Prévost #
Description
Qty
562516
Resistor (240 k
Ω
)
1
Not
e
:
Material can be obtained through regular channels.
1. Open engine compartment doors, locate electric junction box, then open panel.
2. Replace resistor (Prévost # 562342) by (Prévost # 562216) on R66 relay (Fig. 10).
3. Close electric junction box, then engine compartment rear doors.
Summary of Contents for PNEUMATIC SYSTEM IMPROVEMENT
Page 10: ...96 14B Page 10 18 FIGURE 2 PNEUMATIC DIAGRAM REFERENCE DIAGRAM D140196 12095 ...
Page 11: ...96 14B Page 11 18 FIGURE 3 PNEUMATIC SYSTEM REFERENCE DIAGRAM D140204 12096 ...
Page 12: ...96 14B Page 12 18 FIGURE 4 PNEUMATIC SYSTEM REFERENCE DIAGRAM D140131 12097 ...
Page 16: ...96 14B Page 16 18 FIGURE 9 FRONT ELECTRICAL COMPARTMENT 06187 ...
Page 18: ...96 14B Page 18 18 FIGURE 10 REAR ELECTRICAL COMPARTMENT 06188 ...