background image

Page 9 of 16

STEP 7

Estimated Time: 10 minutes 

Attach the two inner gables to the inner fixed shelf (C6) with 
Confirmat screws.  Add screw cover caps to finish.

7a

FRONT

Make sure all
Finished Edges
are facing the UP

Attach inner fixed shelf to left (C4) and right (C7) gables with Confirmat 
screws. Add screw cover caps to finish.

7b

C6

C5

Assemble Center Shelf Section:

C5

C6

C7

C4

Summary of Contents for SH-6656

Page 1: ...acmfg com Model SH 6656 Assembly Instructions CALL US FIRST 1 877 PREPAC1 1 877 773 7221 Mon Fri 7am 4pm PST 10am 7pm EST For help with assembly If you have received a damaged or defective part or are...

Page 2: ...125 Black SH 4925 Cherry SH 4625 Espresso Outer Fixed Shelf 2 SH 4124 Black SH 4924 Cherry SH 4624 Espresso Inner Gable 2 GA 4125 Black GA 4925 Cherry GA 4625 Espresso Large Stabilizer 1 ST 4125 Black...

Page 3: ...d Time 5 minutes 1a 1b Lie stabilizers and large fixed shelf on the floor Finished Edge Front Large Fixed Shelf NOTE Shaded areas represent the UNFINISHED side of the piece Left Small Stabilizer Right...

Page 4: ...nd of the double ended connecting rod and tighten the cam 2c Repeat for the right small stabilizer C14 STEP 2 Estimated Time 5 minutes Unlocked Locked Turn 210 Tightening Cams Large Stabilizer Left Sm...

Page 5: ...s into holes on the top of the left and right gables and left and right sides Estimated Time 5 minutes 3a 3b Insert green twister dowels into remaining holes on the left and right sides Right Side Lef...

Page 6: ...ghten cams slightly Make sure the stabilzers and shelf are positioned squarely with the side Fully tighten cams using a flathead screwdriver Position the large fixed shelf as shown with the finished e...

Page 7: ...Page 7 of 16 STEP 5 Estimated Time 5 minutes Repeat to attach the 2nd side Make sure the pieces are square Unlocked Locked Turn 210 Tightening Cams...

Page 8: ...Estimated Time 5 minutes Hammer levelling feet to the bottom of each side Attach L brackets with Washerhead Screws to secure large stabilizer to fixed shelf 6a 6b OR 8 9 16 Washerhead Screws Large Sta...

Page 9: ...r fixed shelf C6 with Confirmat screws Add screw cover caps to finish 7a FRONT Make sure all Finished Edges are facing the UP Attach inner fixed shelf to left C4 and right C7 gables with Confirmat scr...

Page 10: ...Page 10 of 16 STEP 8 Estimated Time 5 minutes Attach the center shelf assembly to the large fixed shelf with Confirmat screws...

Page 11: ...Page 11 of 16 STEP 9 Estimated Time 5 minutes Attach outer fixed shelves with Confirmat screws as shown Finish with screw cover caps C9 C9...

Page 12: ...ster dowels into remaining holes on the top STEP 10 Estimated Time 10 minutes GENTLY hammer plastic dowels HALFWAY into the following holes on the underside of the top The 4 holes along the front to a...

Page 13: ...Par s if ca io Cabinet t Ident i t n STEP 11 Estimated Time 5 minutes Lower top and gables onto left and right sides and tighten cams Unlocked Locked Turn 210 Tightening Cams Page 13 of 16...

Page 14: ...of 16 Par s if ca io Cabinet t Ident i t n Estimated Time 5 minutes Par s if ca io Cabinet t Ident i t n STEP 12 Estimated Time 5 minutes Attach Backer with nails Position nails in the center of the b...

Page 15: ...r s if ca io Cabinet t Ident i t n Estimated Time 5 minutes STEP 13 Move headboard into desired location and position either Double Full or Queen bed against headboard NOTE if moving headboard in a ca...

Page 16: ...an cloth to maximize the life span and look of your unit Q Can I paint or varnish your products A Our products are made from durable composite woods with a laminate finish and therefore should not be...

Reviews: