Page 12 of 16
Position the front molding in place
and press down firmly to secure.
Screw green twister dowels into remaining holes on the top
STEP 10
Estimated Time: 10 minutes
GENTLY
hammer plastic dowels
HALFWAY
into the following
holes on the underside of the top:
•
The 4 holes along the front to attach top molding
•
The 4 holes in the center of the top to attach to inner gables
10a
10b
10c
Back