background image

Double Barrister Tower

Haute Étagère Barrister 
Double Largeur

Prepac Manufacturing Ltd.
6705 Dennett Place
Delta, BC V4G 1N4

LB-0496-R
2013-05-29

Model # MB-0800

This product is shipped in 

1 carton

1 of 1

D

A

T

E

 S

T

A

M

P

Assembly Instructions

Mode d’assemblage

CALL US FIRST

1-877-PREPAC1
1-877-773-7221

Mon - Fri

7am - 4pm PST
10am - 7pm EST

For help with assembly

If you have received a damaged or defective part or are 
missing hardware. 

 
We will process replacement parts 

UPS Ground or mail.

Before you call please:

2) Note 

the

3)  Review the contents of your shipment to determine 

what you are missing. 

in 2 business days or 

less.  Parts are shipped via 

1)

Record the following information from the shipping label 
on the outside of the box.  You will need it for warranty 
purposes:

Ship To Name 

Sales Order Number

 product model number.

Required 

Outils nécessaires

Tools / 

Screwdrivers

Tournevis

Flat Head

Principal plat

Using a power screwdriver will speed up  assembly. 

Caution

Do not over tighten any screw.  The last few turns of each 
screw should be done very slowly or by hand.

Phillips Head

À pointe

Optional Tools / 

Outils Facultatif

Hammer

Marteau

Pour le service en français, contactez s’il vous plaît votre détaillant.

Utiliser la puissance un tournevis 
accélérera l'assemblée. 

Attention

Au-dessus de ne serrer aucune vis.  Les derniers 
tours de chaque vis devraient être faits très lentement ou à 
la main.

Online Option:

Fill out the Replacement Parts Order form in the Product 
Support section of our website: 

www.prepacmfg.com

Summary of Contents for MB-0800

Page 1: ...following information from the shipping label on the outside of the box You will need it for warranty purposes Ship To Name Sales Order Number product model number Required Outils n cessaires Tools Sc...

Page 2: ...es ajustable 18 SH 0214 Black Noir T7 Plain Wood Dowel 3 Goujons de bois naturel RM 0069 2 Confirmat Screws 6 Vis Confirmat 2 RM 0001 Nail 44 Clou RM 0022 Metal Dowel Pins 74 Goujons de m tal RM 0014...

Page 3: ...sert Ins rer les tiges rapides bleus dans le dessous du dessus dans l endroit montr Puis utilisant un marteau brancher DOUCEMENT 3 goujons de bois naturel et 4 goujons en plastique noirs MI CHEMIN dan...

Page 4: ...tic dowels halfway into each molding Marteler DOUCEMENT les goujons en plastique mi chemin dans chaque moulure 5 Plastic Dowel Goujon en plastique Side Molding Moulure lat rale Attach bottom with Conf...

Page 5: ...ur avec les goujons en plastique dans le dessus Presser fermement sur les moulures pour fixer en place Turn moldings over and align with the holes on the cabinet sides and gables Press down firmly on...

Page 6: ...tal dans les trous des tablettes et posez les tablettes C C Page 6 of 8 Nail Clou Attach backer using nails Leave 2 3 space from each corner Posez le dos l aide des clou Laissez des 2 ou 3 po l espace...

Page 7: ...m Attachez le 2 me base de support au mur 2 inf rieurs celui sur le module Important Trouvez un goujon de mur et attachez la base de support avec la vis 1 non inclus Si vous ne pouvez pas localiser un...

Page 8: ...t ce que je nettoie vos produits A Nous recommandons que vous essuyez simplement vos produits avec un propre tissu humide et puis s chons imm diatement avec un autre tissu propre pour maximiser la dur...

Reviews: