background image

INSTALLATION:

   • Do not locate the germicidal lamp within 20” of plastic material that will be directly exposed to the UV light, 

such as wiring, return-side humidifier or certain types of air filters. Check with the filter manufacturer to see if their 

material is UV resistant. Over time, UV light may degrade plastic. 
   • Do not touch the glass portion of the lamps with bare hands because oils from the hands can cause “hot spots” 

which reduce lamp life.  Handle either by the end caps or use a soft cloth.  If you accidentally touch a lamp, wipe it 

off, using the included alcohol cleaning pad or a soft cloth dampened with rubbing alcohol.

INSTALLING THE GERMICIDAL UNIT

MOUNTING GERMICIDAL LAMP AND POWER SUPPLY (supply or return side plenum)

1. Unplug mid-cord connector by pressing the lock release (marked “PRESS” on the connector.) (see photo B)

    Remove two thumb nuts holding moisture resistant lamp socket to mounting plate and remove from the plate.
2. Using the lamp mounting plate as a template, draw the hole pattern on the air duct in a suitable location.
3. Using a 1 1/4 inch Vari Bit, make two holes side by side. Clean off excess metal between the two 

    holes with tin snips. Alternately cut a 2” hole.
4. Peel off the gasket backing from lamp mounting plate and center over hole. Secure using four

    self-tapping sheet metal screws provided.  Repeat steps 1-4 for the second lamp.
5. Find a suitable location to mount the power supply making sure supply cord to ballast will reach 120 or  

    240 volt power supply.  Mount the power supply using four self-tapping sheet metal screws provided.
6. Taking care not to touch the glass, hold the lamp by the end cap and insert fully into the base plate.
7. Insert the moisture resistant lamp socket over the plastic lamp end fitting over the mounting studs, 

    secure using the two thumb nuts. (Photo A)
8. Route cord back to the moisture resistant lamp socket and reconnect mid-cord connector. Be sure to line up 

    arrows on the connector. (Photo B)

9.  Adhere included UV Warning Label onto ductwork within six inches of UV lamp.

WIRING/FUSE

     The multivoltage ballast is self-adjusting and operates with voltages from 120 - 240 VAC.   For 120V wiring 

connect the black wire to L1, white wire to neutral, green wire to ground. For 240V wiring install 5 amp inline 

fuses to both legs of power, then connect the black wire to L1, white wire to L2, green wire to ground. Be sure 

power cord is secured with included strain relief connector.

     It is not necessary to cycle the germicidal air purifier with the furnace blower.  You may allow the unit to run 

continuously or have it interlocked with the furnace blower.   If a 120 VAC EAC terminal is available, supply 

power to the unit from the EAC terminal. Connect in accordance with local wiring codes.  If there is no EAC

terminal, interlock the UV unit with the furnace blower using an appropriate alternate.  Wire the unit in accordance 

with local wiring codes.  After installing, verify voltage is operating between 120 - 240 VAC 

with air handler operating.

Reviews: