Owner’s manual

 

Page 4/14

 

20220816 

Phosphorus removal unit (DpEC) 

 

Item # 339921 

 

The primary reactor model PRT-660 is designed to treat up to 1,440 L/d (up to 4 bedrooms). the primary reactor model PRT-960, 
composed of 2 tanks installed in series,

 

is designed to treat up to 2,160 L/d (up to 6 bedrooms). The EC unit, model DpEC-090 can 

also treat up to 2,160 L/d (up to 6 bedrooms). As the primary reactor the electroagulation unit is available in concrete or polyethylene. 
Designation of different models is show in the table below. 

1.3.

 

Watertight sand filter 

The watertight sand filter is a wastewater treatment system whose design is based on the replacement of the natural soil layer by a 
filtering media. The sand filter unit combined with a phosphorus removal unit (DpEC) provides an efficient solution for phosphorus 
removal and for disinfection. 

 

At the phosphorus removal unit (DpEC) effluent, the wastewater is directed to the watertight sand filter by a pumping station to feed the 
distribution device. The water percolates vertically through the sand bed and then collected by a network of perforated pipes located 
on the gravel bed at the base of the watertight sand filter.  

 

The sand filter allows continuous or intermittent use without requiring any special precautions and without any impact on the quality of 
the treatment. The owner has no particular action to make to bring the system into operation; the owner only needs to ensure 
compliance with the operating instructions described below.

 

 
The dimensions of the 

watertight sand filter

 are determined by the number of bedrooms in the residence or by the total daily flow of 

wastewater coming from the residence and any domestic wastewater coming from any other type of building.

 

 

1.3.1. Dimensions of the watertight sand filter 

1.4.

 

Triggering system start-up 

The start-up of the phosphorus removal unit (DpEC) (i.e. the electrification of the Electrodes and Agitating Pump) can be performed 
two ways. However, two simultaneous conditions must be taken into consideration. Should one of these two conditions not be met, 
the system will not start. The device will also detect the presence of incoming wastewater. 

 

 

Number of bedrooms 

Maximum daily flow (L/d) 

Polyethylene 

Electrocagulation unit  

Concrete  

Electrocagulation unit 

540 

DpEC-090P 

DpEC-090B 

1 080 

DpEC-090P 

DpEC-090B 

1 260 

DpEC-090P 

DpEC-090B 

1 440 

DpEC-090P 

DpEC-090B 

1 800 

DpEC-090P 

DpEC-090B 

6* 

2 160 

DpEC-090P 

DpEC-090B 

Total daily flow 

Number of bedrooms 

Length of the sand filter 

Width of the sand filter 

1,080 L 

2 and less 

6.4 m 

3 m 

1,260 L 

1,440 L 

1,800 L 

4.5 m 

2,160 L 

Summary of Contents for REWATEC Phosphorus removal unit

Page 1: ...Owner s manual Phosphorus removal Certified to BNQ standard NQ 3680 910 2022 Certified to CAN BNQ standard 3680 600...

Page 2: ......

Page 3: ...ed with a watertight sand filter it is an NQ 3680 910 and CAN BNQ 3680 600 certified disinfection system This document contains information concerning the operating guidelines the maintenance as well...

Page 4: ...treatment systems designed by Premier Tech are a technological advancement based on phosphorus removal by electrocoagulation This technology specially developed to treat wastewater from onsite applica...

Page 5: ...odes During system operation the wastewater is mixed with aluminium particles freed from the electrodes The aluminium charged effluent from the reaction zone then transfers freely to the separation zo...

Page 6: ...inuous or intermittent use without requiring any special precautions and without any impact on the quality of the treatment The owner has no particular action to make to bring the system into operatio...

Page 7: ...coffee beans cigarette butts sanitary napkins tampons condoms cotton swab etc It is important that anyone using or maintaining the septic installation or property installer landscaper owner snow remo...

Page 8: ...e system can be postponed No request for delayed start up will be accepted any later than one 1 year after the purchase date without this affecting the product s warranties 2 4 Start Up Upon the compl...

Page 9: ...eatment system There must be a follow up with the proper verifications The TEST button allows you to check if the alarm system is working properly During a test the red indicator should light up and a...

Page 10: ...es is mandatory Use four 4 separate circuit breakers two to operate the control panel one to connect the alarm box and the last one for TLP FAS when required No other household appliance should be con...

Page 11: ...recommend that you keep all invoices and documents returned to you as proof of the regular maintenance of your system 5 1 Primary reactor The pumping out of the primary reactor must be performed when...

Page 12: ...n and phosphorous removal must at least once per 6 month period have a sample of the system s effluent analyzed to determine the concentration if any of fecal coliforms or total phosphorous The owner...

Page 13: ...time of publication Premier Tech Ltd makes no warranties or representations as to its accuracy Because of its continuous improvement policy Premier Tech Ltd and its affiliated companies reserve the ri...

Page 14: ...ech or by a qualified third party as referred to in section 1x 2 of the Regulation respecting waste water disposal systems for isolated dwellings Q 2 r 22 h Any damage or problem caused by an omission...

Page 15: ...r the Customer s Successors to cover the cost of the inspection 10 INTERPRETATION The terms and conditions of this warranty shall be interpreted according to and governed by the provisions of this war...

Page 16: ...I hereby declare that the residence serviced by a Premier Tech treatment system located at the above address changed ownership on this date If you are the PREVIOUS owner I have provided the system s O...

Reviews: