background image

Installation Guide

 - SAM IFJ

www.premiermounts.com  |  North America  800.368.9700  | Interna1-714-632-7100

1

2

Page 6

Horizontal 

Rail

M5 x 8mm 

Flat Head

Install the Vertical and Horizontal Rails together using (4) M5x 8mm Flat Head Screw per.

1.  Determine the desired location by calculating the height of the pre-mounting hang location using  

 

the table on page 3.  

2.  Use any commercially available hardware to temporary hang the mount.

METHOD 1 

Support 

Screws

To temporary 

hang the mount

48” apart

Vertical Rail 

(center)

Vertical Rail 

(left and right)

Summary of Contents for CONVERGENT SAM-IFJ Series

Page 1: ...North America 800 368 9700 International 1 714 632 7100 2620 Palisades Drive Corona CA 92882 USA 9500254 v1 1 publ 01 24 19 SERIES SAM IFJ INSTALLATION GUIDE Convergent Series Video Wall Mount For Sam...

Page 2: ...GUIDE MUST BE READ IN CONJUNCTION FOR SUCCESSFUL INSTALLATION ANY QUESTIONS CALL PREMIER MOUNTS 2 INSTALLATION MUST MEETS THE REQUIREMENTS APPROVED BY THE STRUCTURAL ENGINEER 3 FRAME MUST BE PLUMBED S...

Page 3: ...DIMENSIONS AND MOUNTING LOCATIONS The overall dimensions of any video wall array can be calculated by using the table within this page The desired array size is a combination of available sizes Add th...

Page 4: ...nd Rail 5V 17 4000 300 552 LX Vertical Center Rail 5V 18 4000 300 553 LX Vertical Right End Rail 5V ITEM PART NO DESCRIPTION 1 4000 300 501 LX Horizontal Rail 1H 2 4000 300 502 LX Horizontal Rail 2H 3...

Page 5: ...ALL TIMES DO NOT REMOVE Wall Leveling Bracket Floaters must be install on every edge and middle location if applicable of each Horizontal Rail When installing an adjacent horizontals only one floater...

Page 6: ...al and Horizontal Rails together using 4 M5x 8mm Flat Head Screw per 1 Determine the desired location by calculating the height of the pre mounting hang location using the table on page 3 2 Use any co...

Page 7: ...e first mounting location by sliding a Wall Anchor Plate behind the mount and fasten using 1 4 x 5 Hex Lag and 1 4 Washer 3 Maintain a 1 8 minimum gap from the anchor plate and the rail when anchoring...

Page 8: ...ll 3 Secure the first mounting location by sliding a Wall Anchor Plate behind the mount and fasten using 1 4 x 5 Hex Lag and 1 4 Washer 4 Maintain a 1 8 minimum gap from the anchor plate and the rail...

Page 9: ...step ASSEMBLE THE LOWER SECTION OF THE MOUNT Install a few support screws commercially available hardware to temporary hold the lower section in place prior to final mounting location Vertical Rail R...

Page 10: ...ent Plate and fasten together using 4 M5 x 8mm Flat Head Screw for each rail 4 Install the remaining Vertical Rails center using 4 M5 X 8mm Flat Head Screw 5 Install the lower section of the mount as...

Page 11: ...to each other 2 Joint the units together using multiple Attachment Plate and fasten using 2 M5 x 8mm Flat Head Screw per 3 When extending the height of a video wall array the middle row shares the Hor...

Page 12: ...nstallation Guide SAM IFJ www premiermounts com North America 800 368 9700 International 1 714 632 7100 6 Page 12 Inspect each bracket using a Square and Level tool LASER LEVEL SQUARE AND LEVEL 00 0 o...

Page 13: ...Dia hole M5 x 0 5mm tapped hole with supplied M5 x 20mm 1 Install whereever necessary 2 Use multiple drywall or wood screws to bring the bracket closer to the wall 3 Use multiple M5 x 0 5 tapped scre...

Page 14: ...site and verify the diagonal measurements 3 Proceed only if the two measurements are equivalent 4 Secure the lower mounting location by sliding a Wall Anchor Plate behind the mount and fasten using 1...

Page 15: ...entire array 2 Tie horizontally and crisscross especially for large video wall array 3 Inspect for any gaps between the brackets and the string 4 Adjust any neccessary mounting location FINAL ALIGMEN...

Page 16: ...e SAM IFJ www premiermounts com North America 800 368 9700 International 1 714 632 7100 10 Page 16 Uneven wall surfaces can be adjust by turning the Flush Bolt In Out Adjustments REMINDER 1 8 min gap...

Page 17: ...level to the wall vertically and horizontally Must use shims commercially available on every slots being used to fill the void between the wall and the frame Avoid over tightening the screws as this w...

Page 18: ...he recommended steps below LED Cabinets to be handled by industry qualified professional Improper installation may cause damage to the LEDs Keyhole Slot 1 Install the first LED Cabinet from the center...

Page 19: ...LED Cabinets to prevent abrupt release of the cabinets 2 Slowly slide the Gap It tool away from the LED Cabinets while lowering into place See Figure 2 RECOMMENDATION ONLY INSTALL WITH GAP IT TOOL Fi...

Page 20: ...inet by others LED Diode PCB Cabinet PET Sheet 0 0 5mm IMPORTANT SECURE THE LED MODULES The LEDs must be perfectly installed without any noticeable seams black bars or imperfection of the LED modules...

Page 21: ...air or replace such products determined by Premier Mounts to be defective RETURNING THE PRODUCT TO PREMIER MOUNTS PDS 1 Products must be packed securely to insure no further damage upon arrival at Pre...

Reviews: