background image

 2

 

www.pregis.com 

 

52

-

OM216

-

1

 

 

 
 
 

Safety Information

 

Description and Purpose of Machine

 

Specification and Maintenance

 

Set Up

 

Controls

 

Pre

-

start checks

 

Operation

 

Paper Jam

 

Troubleshooting

 

EC Declaration of Conformity

 

 

 

3

 

4

 

5

 

6

 

8

 

10

 

11

 

13

 

14

 

15

 

Contents

 

Summary of Contents for Easypack coiler-lite

Page 1: ...Operating Manual EN 52 OM216 1 English Easypack ...

Page 2: ...M216 1 Safety Information Description and Purpose of Machine Specification and Maintenance Set Up Controls Pre start checks Operation Paper Jam Troubleshooting EC Declaration of Conformity 3 4 5 6 8 10 11 13 14 15 Contents ...

Page 3: ...OT operate equipment if you are under the influence of alcohol drugs or medications that can make you less alert or affect your judgment The machine can be stopped at any time by pressing the red 0 switch This cuts all supply to the control panel and motors THIS MACHINE MUST BE EARTHED The wires in the mains cable are coloured as such GREEN YELLOW BLUE BROWN EARTH NEUTRAL LIVE It is important that...

Page 4: ...m diameter All of our paper is 100 recycled 100 recyclable and 100 biodegradable These coils can be produced quickly either for immediate use or to store for later use The Coiler is simple to use providing a hands free repeat option which allows production to con tinue Advanced safety features ensure safe operation at all times The Machine is of rugged design and construction and is quickly wiped ...

Page 5: ...g a jam or cleaning the Machine Activity around the machine should not put the mains supply cable and foot switch line in danger of sustaining damage or being a trip hazard If in doubt unplug the Machine and contact your local Pregis office Do not allow water or other liquids to drip on or into the Machine If the Machine fails to operate check the Troubleshooting Guide Clean the Coiler using a lin...

Page 6: ...ce with M12 x 110mm bolts 4 Secure with nuts and tighten 3 Align additional holding bars to the newly added bolts Setting up the Packmaster Pro for the Coiler lite 5 The machine should look like this The Coiler lite Packmaster Pro and the frame arrive detached from each other and will require assembly NOTE This should be done only by Pregis engineers ...

Page 7: ...ct the holding arms from the Coiler lite into the newly added holding arms of the Packmaster Pro 4 Once all four bolts are in tighten and secure 3 With one person navigating the Coiler lite for alignment loosely screw in the bolts to hold into place Attaching the Coiler lite to the Packmaster Pro NOTE This should be done only by Pregis ...

Page 8: ...ontrols Mains Power Switch Switch illuminates when switched on Control box Refer to the next page for an explanation of the Control Console functions Coiler lite Control Console Packmaster Pro Control Console Power switch on reverse side of Coiler lite ...

Page 9: ...id cycle Home Button Resets the Coiler lite if an error has occurred Coil Indicator Illuminates whilst making a coil and flashes when the coil is completed and requires removal Coil Size Control Selects the required coil size The coil size will vary with different grades of paper Tail Position Switch This selects the position of the tail of the coil Switch to left normal position coil is completed...

Page 10: ...ug as shown 2 Plug in mains and switch ON the Packmaster Pro and check switch is illuminated 3 Plug in mains and switch ON the Coiler lite and check switch is illuminated 4 Ensure the sensor lights control console light and dots on the Packmaster Pro console are displayed ...

Page 11: ...te 4 A loading pack will be generated automatically remove this from the Coiler lite Load the Packmaster Pro with paper in accordance to the Packmaster Pro manual 2 Press the blue Feed button on the Packmaster Pro 5 Select the required coil size using the Coil Size Selection Knob NOTE The coil size will vary with different grades of paper ...

Page 12: ...l to be produced 2 Switch to left normal position Coil is completed with the tail in the bot tom position which keeps the tail in position until the coil is removed Coil production can be stopped at any point during the winding process by pressing the Red Stop button This will immediately stop the pack being produced by the Packmaster pro and will result in a smaller incomplete coil This may place...

Page 13: ... 1 If there is a paper jam turn ma chine OFF and unscrew the T han dles 3 Carefully remove the jammed paper 4 Once paper jam has been cleared lower and secure the top gear and operate as normal 2 Lift the top gear to reveal the jammed paper ...

Page 14: ... back of the machine on the far left Fault Check Machine will not produce a coil even though the Blue In dicator Light is not flashing Machine needs to be reset Press the Home button Power indicator not lit on mains switch of machine Machine is connected to the mains supply Mains supply is switched on Fuse in machine is okay Fuse in mains plug is okay Machine will not switch on control panel Power...

Page 15: ...iption of Product Coiler lite Model No Serial No 52 The following transposed harmonized European Standards have been used EN 12100 2010 Safety of Machinery Basic concepts general principles for design EN 13857 2008 Safety of Machinery Safety distances to prevent hazard zones being reached by upper and lower limbs EN 60204 1 2006 Safety of Machinery Electrical equipment of machines General requirem...

Page 16: ......

Reviews: