ProtEX-MAX PD8-6100 Strain Gauge, Load Cell, and mV Meter
Instruction Manual
43
Pump Alternation Control Operation
Relay Sampling Operation
When the signal crosses the set point, the relay trips and the sample time starts. After the sample time has elapsed,
the relay resets. The cycle repeats every time the set point is crossed, going up for high alarms and going down for
low alarms.
The sample time can be programmed between 0.1 and 5999.9 seconds.
Summary of Contents for ProtEX-MAX PD8-6100
Page 2: ...2 ...
Page 62: ...ProtEX MAX PD8 6100 Strain Gauge Load Cell and mV Meter Instruction Manual 62 NOTES ...
Page 63: ......