1. Press the “Switch off” button on the remote 

control. Switch off the ventilation system.

2. De-energize the ventilation system.

7. Extract the heat exchanger and fans 

from the body.

6. Unscrew the self-tapping screws through 

special openings. Remove the fl ange.

MAINTENANCE

The maintenance consists in periodic (recommended 1-2 times a year) and preventive 

inspection of surfaces of the fans and the heat exchanger and, if necessary, in cleaning 

them. The procedure for disassembling / assembling the device for / after cleaning:

3. Open the lid of the recuperator.

4. Turn the fasteners of the lid and remove it.

5. Disconnect the cable and remove the power wires by 

pressing the terminals. Remove the lid.

Summary of Contents for 150

Page 1: ...1 TECHNICAL OPERATING DOCUMENTATION Inflow and exhaust ventilation system with heat recovery PRANA 150 PRANA 200C PRANA 200G 8 ...

Page 2: ...tems PRANA 150 PRANA 200C PRANA 200G are intended for creation and maintenance of healthy microclimate in premises These systems are recommended for use in residential and public facilities apartments houses office premises educational establishments kindergartens etc Monoblocks of the centralized anti current inflow exhaust ventilation PRANA 150 and PRANA 200 belong to the category of innovative an...

Page 3: ...t the minus temperature from the outside the use of the Winter Mode is mandatory MAIN TECHNICAL CHARACTERISTICS PRANA 150 PRANA 200G PRANA 200C Diameter of the working module mm with thermal insulation mm 150 160 200 210 200 210 Diameter of the mounting hole mm Length of the working module mm 162 475 215 440 215 500 Recommended area of the premises m 2 60 60 120 Amounts of air exchange during reco...

Page 4: ... the movement of uncontrolled airflows through the recuperator due to the difference in pressure and temperature inside and outside the premises It is allowed to use when the difference between outside and inside temperatures is no more than 5 o C Defrosting WARNING In the cold season the improper operation of the recuperator is likely to freeze it When freezing it is necessary to activate function...

Page 5: ... and the dimensions of ventilation system PRANA 150 PRANA 200G PRANA 200C a the ventilation grid and air intake in the premises b monoblock side view c the ventilation grid and air intake from the outside 535 475 35mm 500mm 475 a a a a b b b b c c c c ...

Page 6: ...he normal operation of the system it is necessary that its body facing the the outside extends beyond the wall by 1 2 cm to the beginning of the air intake Fig 4 INSTALATION Fig 4 The diagram of installing the recuperator in the wall airborne airborne grille grille airborne grille airborne airborne grille airborne 50 mm 50 mm unit slope unit slope 3 5 degrees 3 5 degrees unit slope 3 5 degrees uni...

Page 7: ...n laid to the mounting hole then the power supply to the working module cable is carried out in the immediate vicinity of the body of the recuperator Shorten the electric cable from the recuperator to a length that is convenient for electrical connection All electrical cables used in the installation should have the cross section of 0 5 0 75 mm The operation of the system is controlled using a rem...

Page 8: ...he graphic symbols of the indication correct operation of the device in accordance with the control devices The device must be switched off in case of excessive oscillations and noise damage to the elements of the device body damage to the insulation of the electric cable damage to the elements of automation the temperature of the outside air is below 30 ºС 1 The lid is closed Do not switch on the...

Page 9: ...commended 1 2 times a year and preventive inspection of surfaces of the fans and the heat exchanger and if necessary in cleaning them The procedure for disassembling assembling the device for after cleaning 6 Unscrew the self tapping screws through special openings Remove the flange 7 Extract the heat exchanger and fans from the body 3 Open the lid of the recuperator 4 Turn the fasteners of the lid...

Page 10: ...and be below during the installation 14 The flange must be installed correctly the larger protrusion of the should be below 11 Clean the heat exchanger in adry or if necessary in a wet manner WARNING Before rinsing or wet cleaning of the heat exchanger make sure that all the electrical components and parts are removed from the heat exchanger except for the components of heating with minimally raise...

Page 11: ...enance are carried out only after the device is disconnected from the electrical supply network WARNING Do not operate the ventilation system if there is a threat that foreign objects may enter the inflow part of the body which objects may jam or damage the impeller of any of the two fans WARNING Do not operate the ventilation system in premises where the air contains aggressive substances and does...