![prana 150 Technical-Operating Documentation Download Page 10](http://html.mh-extra.com/html/prana/150/150_technical-operating-documentation_1593558010.webp)
10
ASSEMBLY IN THE REVERSE ORDER
The technological process provides for 100% inbound quality control for all components,
as well as double 100% inbound control after their manufacture and 24-hour run in the
maximum power mode.
Transportation and storage of the products in individual packing boxes is ensured in a
horizontal position.
Keep the recuperator in the factory packaging under the cover or (in enclosed space) with
relative humidity of air of no more than 70% and air temperature from -20˚С to + 40˚С.
TRANSPORTATION AND STORAGE RULES
12. The drain in the heat exchanger and
the body must coincide and be below
during the installation.
14. The fl ange must be installed correctly;
the larger protrusion of the should be below.
11. Clean the heat exchanger in adry or, if
necessary, in a wet manner.
WARNING!
Before rinsing or wet cleaning of the
heat exchanger, make sure that all
the electrical components and parts
are removed from the heat exchanger
(except for the components of “heating
with minimally-raised temperature”and
“heating the condensate drainage with
raised temperature”.
QUALITY
9. Unscrew the self-tapping screws.
Remove the fans on both sides.
10. Remove the blades from the fan
housings and clean them in a dry manner.
>
Summary of Contents for 150
Page 12: ...12 ...