
Page
|
9
Issued by technical department Prakash pump
Copyright - 2016
Power supply
Note:
All work of an electrical system must be carefully carried out by skilled person only.
Make sure the frequency and mains voltage correspond with the name plate data.
Check whether the power supply is conformed to the stipulation of name plate before
installation.
Power supply connected with the pump must be assembled with ELCB, and the voltage
fluctuation must be controlled within ± 10% of rated.
For connection of cables in the well, use thermo-shrinking insulation sheathes or other
system used for submerged cables.
The operating temperature limiting the drop in voltage to at most 3%.
The live wire should made dead before making the connection.
The connection between the pump and the other part must be made using suitable material
for submersed cables and in compliance with the current regulation from local electricity
board authority.
All checking of connection should be checked by appropriate instruments.
Important
While installing the motor pump, avoid impact, rubbing or anything else that can
damage the power cable or puncture the cable leading to short-circuit.
Direction of rotation
The direction of rotation is clockwise,
Rotation speed
All the models are suitable for speed of 2900 rpm.